Hardware installation

IFor PRIMECENTER Racks and DataCenter Racks:

The mounting of the rails in the different racks is described in the next sections. Installation of the cable management is described in detail in the Technical Manual for the respective rack.

IFor 19-inch standard rack (for the Japanese market):

For information on mounting of the rails in the 19-inch standard rack (for the Japanese market) please refer to the "Rack system structure guide" (refer to http://primeserver.fujitsu.com/primergy/peripheral/rack/).

3rd party racks

Certain general conditions must be met:

Installation dimensions (see the dimensions shown in figure 2 on page 45):

1 Front of rack

2 Rear of rack

A Rack depth (comparison PRIMECENTER Rack 940/1000/1100 mm)

B Rack width (comparison PRIMECENTER rack 700 mm)

C Clearance for 19" installation level C1 Front 19" installation level

C2 Rear 19" installation level

D Cable routing area (cable area depth) and ventilation

E Space for front panel and ventilation

F Space for right and left support systems

P PRIMERGY rack installation depth a1 Front left support upright

a2 Front right support upright

b1 Rear left support upright

b2 Rear right support upright