
Floorstand model | Preparation |
4.1Floorstand model
I For some expansions and conversions, it is advisable to lay the server on its
4.1.1Opening the server
ÊTerminate all applications and shut down the server correctly.
ÊIf your operating system has not switched off the server, press the On/Off button.
ÊPull all power cords out of the power outlet.
ÊIf required, remove the lock on the side cover.
ÊIf necessary, lay the server on its
Get a second person to help you do this. The server can weigh around 25 - 40 kg (depending on the configuration).
Make sure that the server feet protrude over the table edge.
Figure 2: Removing the side cover
ÊPull the locking lever as far as it will go (1). This pushes the side cover backward (2).
ÊRemove the side cover (3).
28 | Options Guide | TX300 S6 |