Digital Energy

Multilin

Multilink ML1200

Managed Field Switch

Chapter 1: Introduction

1.1Getting Started

1.1.1 Inspecting the Package and Product

Examine the shipping container for obvious damage prior to installing this product; notify the carrier of any damage that you believe occurred during shipment or delivery. Inspect the contents of this package for any signs of damage and ensure that the items listed below are included.

This package should contain:

Multilink ML1200 Managed Field Switch, base unit (configured with user-selected port module options installed)

1 Set of two metal vertical mounting brackets, with screws to the case

1 Installation and User Guide (this manual)

1 Product Registration Card

Remove the items from the shipping container. Be sure to keep the shipping container should you need to re-ship the unit at a later date. To validate the product warranty, please complete and return the enclosed Product Registration Card to GE Multilin as soon as possible.

In the event there are items missing or damaged, contact the party from whom you purchased the product. If the unit needs to be returned, please use the original shipping container if possible. Refer to Section 6, Troubleshooting, for specific return procedures.

MULTILINK ML1200 MANAGED FIELD SWITCH – INSTRUCTION MANUAL

1–1

Page 9
Image 9
GE Multilink ML1200 Managed Field Switch Introduction, Getting Started, Inspecting the Package and Product