Hansol Multitech Uromat 3000 installation instructions Laying the I.I. Cable

Models: Uromat 3000

1 90
Download 90 pages 15.61 Kb
Page 44
Image 44

Fig.25

Fig. 26

2.13 Laying the I.I. Cable

First lay the I.I. cable coming from the wall through the flexible hose (Fig. 23/ Pos. 9), through the back wall (Pos. 10) and then – if it is coming directly through the floor – to the cable channel (Fig. 23/Pos. 11) and up into the unit base.

Lay the I.I. cable parallel to the cables for the unit controller to the cable outlet (on the side of the unit base) (Fig. 25/Pos. 4).

Remove the flexible hose (Fig. 26/Pos. 1). Pull the I.I. cable through the flexible hose to the table, place it in the flexible plastic link chain (Pos. 2) and lay it to the I.I. connector (Pos. 3).

2.14 Making the Power Connection through the Generator

Remove the temporary power connection and connect the power via the generator.

0116 7201

-44 of 90 -

06/00

Rev. 00 © 2000 Hans Pausch Röntgengerätebau

Graf -Zeppelin-Str. 1

D-91056 Erlangen ALL RIGHTS RESERVED Ru

Page 44
Image 44
Hansol Multitech Uromat 3000 Laying the I.I. Cable, Making the Power Connection through the Generator