WattMaster WHP | Section 3 |
|
|
Holidays
Holiday Day Selection
There are 14 Holiday periods available, organized as a Start Day / Stop Day event. If the Holiday only lasts one day, enter the same date for the Start & Stop days. There is no limit to the duration or number of days that can be included in one holiday, other than it cannot extend past December 31st. If you have a holiday that crosses the end of year border, you will need to use two holiday periods to accomplish this event.
StartPrgramHoMon/Day:xxxxlidayHolidays#1
(EX:101=Jan.1) PrgramHolidayHolidays#1 Stop(EX:102Mon/Day:xxxx=Jan.2) EXAMPLE:
Holiday Start / Stop Times
0704 = July 4th
1225 = December 25th
Note:StartopHolidayScheduleWHPEvent#1NormallyCONTROLLER..:xxxxthere is no schedule in the Loop Controller device. It simply looks at ll the Water Source Heat Pumps for a request to run signal. Scheduling is
maintained separately in each Water Source Heat Pump. If you want to be able to schedule all Water Source Heat Pumps on and off at the same time, you can input a schedule on the Loop Controller and it will broadcast that schedule to all WHPs.
Programming |