Heat Controller Water Source Heat Pump manual Holidays, Holiday Day Selection

Models: Water Source Heat Pump

1 126
Download 126 pages 9.48 Kb
Page 69
Image 69
Holidays
The 14 holidays all use the same Holiday Start / Stop time. The start/stop times are programmed back on the Week Schedule screens. The holiday schedule screen appears after the Saturday schedule screen, as you are stepping through the days of the week.
Remember to combine the month and day into a single four digit value.
Line 3 shows which event, the Start Day or Stop Day, is currently being programmed.
The screens will step through the 14 possible holidays, one at a time. Line 2 shows which holiday is currently being programmed.

WattMaster WHP

Section 3

 

 

Holidays

Holiday Day Selection

There are 14 Holiday periods available, organized as a Start Day / Stop Day event. If the Holiday only lasts one day, enter the same date for the Start & Stop days. There is no limit to the duration or number of days that can be included in one holiday, other than it cannot extend past December 31st. If you have a holiday that crosses the end of year border, you will need to use two holiday periods to accomplish this event.

StartPrgramHoMon/Day:xxxxlidayHolidays#1

(EX:101=Jan.1) PrgramHolidayHolidays#1 Stop(EX:102Mon/Day:xxxx=Jan.2) EXAMPLE:

Holiday Start / Stop Times

0704 = July 4th

1225 = December 25th

Note:StartopHolidayScheduleWHPEvent#1NormallyCONTROLLER..:xxxxthere is no schedule in the Loop Controller device. It simply looks at ll the Water Source Heat Pumps for a request to run signal. Scheduling is

maintained separately in each Water Source Heat Pump. If you want to be able to schedule all Water Source Heat Pumps on and off at the same time, you can input a schedule on the Loop Controller and it will broadcast that schedule to all WHPs.

Programming

3-21

Page 69
Image 69
Heat Controller Water Source Heat Pump manual Holidays, Holiday Day Selection, Holiday Start / Stop Times