Installation and Configur ation 74
Figure 30. Connecting the GRF Console
The IBM SP system is up and operating.
The SP system administrator has given you one of these pieces of
information:
The node number assigned to each SP Switch Router Adapter card to
be attached to an SP Switch port
The port location on each SP Switch reserved for specific SP Switch
Router Adapter cards

3.2.1 Order of Information

Here is the sequence of steps you have to complete:
1. An installation overview of tasks involving the SP Switch Router, the SP
Switch Router Adapter card, and the SP system
2. The configuration procedure for the PCMCIA 520 MB disk, which also
initiates system logging
3. A description of which cables to attach between the SP Switch Router and
the SP control workstation, and between the SP Switch Router Adapter
card and the SP Switch
Terminal Settings9600 baudNo parityEight data bitsOne stop bit
GRF 400
VT100
terminal GRF Console (optional)
RS232
(Null
Modem
Cable)
Admin Ethernet
(de0)
cws
Crosspoint
Switch
IP Switch
Control
Board
SP Switch