*Log files that used to be archived by the /etc/{dailyweeklymonthly}

*scripts.

***********************************************************************

size=150000

logfile=/var/log/gr.console

size=11000

logfile=/var/log/gr.boot

7.Save all changes and reboot:

#grwrite -v

#reboot

8.After the SP Switch Router is up and running again, use csconfig -ato verify that the PCMCIA interface is available and the PCMCIA disk are up.

For a quick test, run grconslog -vf.If the setup is correct, grconslog will not complain about a missing /var/log/gr.console file, but instead will show all entries and stay up running, giving updates of new entries to the file onto the screen. To stop grconslog, use Ctrl+C.

3.4 Attaching SP Switch Router Cables

Three types of cables must be attached:

The administrative Ethernet LAN cable

The SP Switch Router Adapter card to SP Switch cable(s)

The ground strap to the SP frame

3.4.1 Ethernet Cable

Route the Ethernet twisted-pair cable between the SP Switch Router unit and the Ethernet hub, then connect the cable to the SP Switch Router control board and to the Ethernet hub. See Figure 31 on page 80 on how this might be accomplished.

Installation and Configuration

79

Page 97
Image 97
IBM 9077 manual Attaching SP Switch Router Cables, Ethernet Cable