IBM RS/6000 manual Power on self test During, Progress Codes Appear Operator Panel display Power

Models: RS/6000

1 290
Download 290 pages 11.29 Kb
Page 22
Image 22

2. Set the power switches of the attached devices to On.

Note: When the system is plugged in but not powered on, the Power On flashes slowly.

3. Press the Power On button.

1

2

3

4

1

Reset

Button

 

 

 

 

 

3

 

Operator

 

Panel Display

 

 

 

 

2

Power

On

Button

 

 

 

 

 

4

 

Power

On

LED

 

 

 

 

 

When

 

you

 

press

the

Power

On

button,

the

Power On LED displays a stead

green

light, and

the

system

starts

a

 

POST

(power on self test).

 

During

POST,

progress

codes

appear

in

the

operator

panel display.

 

4. If

 

the

 

Power

On

LED

does

not

come

on

and

there

is

no

indication

of

you

press

the

Power

On

button,

ensure

that

the power

cord,

located a

of

the

system

unit,

is

plugged

into

a grounded electrical outlet. If

solve

the

problem,

go

to

 

Chapter 9

on

page 9-1. If

the

LED

is

not flash

OK is

not

displayed

in

the

operator

panel

 

display,

go

to

Chapter 6

on

For a more complete discussion of power on methods, see “System Power-On Methods” on page 3-25.

2-2RS/6000 Enterprise Server Model H Series User's Guide

Page 22
Image 22
IBM RS/6000 manual Power on self test During, Progress Codes Appear Operator Panel display Power, Not flash