Testing the Setup

The following is a sample procedure to assure your setup is working.

These tests include communicating with the server operating system. Be sure necessary serial port(s) is configured. If you need assistance, refer Configuration” on page B-4.

The server should be powered off as a result of the “Service Processor Checklist” on page B-1.

Call-In:

1.Go to your remote terminal and call-in to your server. Your server ans offers you the Service Processor Main Menu after requesting your privil access password.

2.Select item 2, System Power Control.

3.Select item 4, Power-On System.

Answer y when asked if you wish to continue powering on the system.

4. After the

system

firmware and operating system

have initialized

the s

login prompt appears at your

remote

terminal if

you set

up

Seamless

Mod

Transfer (refer to page C-6

for more information). This may

take

several

minutes. When

this

occurs, you

have

successfully

called

the

Service

Proc

5. Typelogout to disconnect from the operating system.No TheCarriermessage displays on your remote terminal.

6. Call your server again. The operating system answers and offers you th prompt. If these tests are successful, call-in is working.

7.Login and command your server to shutdown and power off. (The AIX comm

shutdown -Fwill do this.)

8.The messageNo Carrier displays on your remote terminal.

B-2RS/6000 Enterprise Server Model H Series User's Guide

Page 242
Image 242
IBM RS/6000 manual Testing the Setup, Call-In