Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

 

TROUBLESHOOTING & REPAIR

F-20

PROTECTION/SNUBBER BOARD CONTINUITY TEST

WARNING

Service and repair should only be performed by Lincoln Electric factory trained person- nel. Unauthorized repairs performed on this equipment may result in danger to the technician or machine operator and will invalidate your factory warranty. For your safe- ty and to avoid electrical shock please observe all safety notes and precautions detailed throughout this manual.

If for any reason you do not understand the test procedures or are unable to perform the tests/repairs safely, contact the Lincoln Electric service department for technical troubleshooting assistance before you proceed call 216-383-2531 or 1-800-833-9353 (WELD).

_____________________________________________________________________

CAUTION

If machine case sides and top are removed the case back and front must be support- ed. Failure to do this could result in mechanical or electrical damage to the TIG 255.

_____________________________________________________________________

TEST DESCRIPTION

Many circuits pass through the protection/snubber board. The purpose of this test is to determine if the board’s circuitry and components are intact and capable of passing signal currents.

MATERIALS NEEDED

Ohmmeter (Multimeter)

TIG 255 Wiring Diagrams (see Electrical Diagram section of manual)

Protection/snubber board Continuity Table, Figure F.6.

SQUARE WAVE TIG 255

Page 61
Image 61
Lincoln Electric SVM100-A service manual PROTECTION/SNUBBER Board Continuity Test, Test Description