Lincoln Electric SVM100-A Active SCR Test, Figure F.13 PROTECTION/SNUBBER Board Plug Locations

Models: SVM100-A

1 100
Download 100 pages 25.78 Kb
Page 70
Image 70

Return to Section TOC

Section TOC

Return to Master TOC

Master TOC

F-29

TROUBLESHOOTING & REPAIR

 

ACTIVE SCR TEST (continued)

REMOVE PLUGS J10 & J13

PROTECTION/SNUBBER

L9255

J10

J11

J12

J13

J14

J15

FIGURE F.13 - PROTECTION/SNUBBER BOARD PLUG LOCATIONS.

Return to

Return to

TEST PROCEDURE

1.Remove main supply power to machine

2.Remove plugs J10 and J13 from protec- tion/snubber board. See Figure F.13.

3.Remove red insulating paint from heat sink test points. See Figure F.14. DO NOT DISASSEMBLE THE HEAT SINKS.

4.Perform test procedure as outlined in Figure F.15. Repeat test for all four SCR’s

5.Replace any SCR assembly that does not pass test in Step 4

to Section TOC

to Master TOC

SCR3

CATHODE

SCR2

SCR4

ANODE

CATHODE

ANODE CATHODE

Return

Return to Section TOC

Return

Return to Master TOC

SCR1(3 & 4) (1 & 2)

ANODE

PLUG

P10

FIGURE F.14 - SCR TEST POINTS.

SQUARE WAVE TIG 255

Page 70
Image 70
Lincoln Electric SVM100-A service manual Active SCR Test, Figure F.13 PROTECTION/SNUBBER Board Plug Locations