Lincoln Electric SVM100-A service manual Figure F.9 PROTECTION/SNUBBER Board Test Points

Models: SVM100-A

1 100
Download 100 pages 25.78 Kb
Page 66
Image 66

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

F-25

TROUBLESHOOTING & REPAIR

 

 

ARC START TRIGGER CIRCUIT TEST (continued)

 

 

 

3J12

3J13

 

 

 

 

 

 

PROTECTION/SNUBBER

 

 

 

 

 

L9255

 

J10

J11

J12

J13

J14

J15

 

 

10J12

11J13

 

 

 

 

 

 

 

FIGURE F.9 - PROTECTION/SNUBBER BOARD TEST POINTS.

Return to Section TOC

Return to Master TOC

6.Test the resistance from 11J13 on the projection/ snubber board to pin “D” on the six pin amphenol receptacle. (Lead #311). Also check resistance from 3J13 on the projection/snubber board to pin “E” on the six pin amphenol receptacle. (Lead #303).

A.If zero ohms resistance is shown test is okay. Proceed to projection/ snubber board test.

B.If resistance of any value is shown, check wires and connections.

Return to Section TOC

Return to Master TOC

FIGURE F.10 - ARC START TRIGGER CIRCUIT.

SQUARE WAVE TIG 255

Page 66
Image 66
Lincoln Electric SVM100-A service manual Figure F.9 PROTECTION/SNUBBER Board Test Points