4 SETTINGS AND PROCEDURES PRIOR TO OPERATION

MELSEC-Q

(Procedure 4) Ending a ROM/RAM/switch test

(1) Perform the following procedures after checking normal completion/abnormal completion of the test results.

Normal completion : Perform operation (2) to finish tests.

Upon error occurrence : When an error occurs in a switch check or linked operation setting check, set the correct values and test again.

When an error occurs in a ROM or RAM check, check the mounting status of module and test again.

If there is no error in the mounting status of module, consult your nearest dealer or branch office.

(2)Perform the ending procedure for ROM/RAM/switch test

1)Follow the procedure in Section 4.7.2 to perform an individual loopback test operation.

2)Perform the following procedure to end the test and start data communication with an external device.

Set the switch settings on GX Developer according to the procedure specified in Section 4.5.2.

Turn off the power to the station on which the Q series C24 is installed and connect the communication cable with an external device.

Turn on the power to the station on which the Q series C24 is installed.