
MAINTENANCE PROCEDURE
3.3 Fault Repair Procedure for Digital CCIS Line
START
Check the connectors and flat cables between DTI and CCH. |
|
| |||||||||
|
|
| Check the connector |
|
|
|
|
| On the DTI card, set the MBR switch UP . On the CCH card, | ||
|
|
|
|
|
|
|
|
| set the |
|
|
|
|
|
|
|
|
|
|
| On the DTI/CCH card, set the MB switches UP . | ||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| Check whether the connector is correctly connected or not for | ||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| both cards. If the connection is found an improper connection, plug and | ||
|
|
|
|
|
|
|
|
| unplug the connector for a few times. |
|
|
|
|
|
|
|
|
|
|
| On the DTI and CCH cards, set the MB and MBR switches | ||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| DOWN . |
|
|
|
|
|
|
|
|
|
|
| Check whether the fault is still indicated or not. |
| |
|
|
|
|
|
|
|
|
|
| ||
|
|
| Check the flat cable |
|
|
|
|
| On the DTI card, set the MBR switch UP . On the CCH card, | ||
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
| set the |
|
|
|
|
|
|
|
|
|
|
| On the DTI and CCH card, set the MB switches | UP . | |
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| Test the continuity of the flat cable. If found abnormal, | ||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| replace the flat cable with spare. |
|
|
|
|
|
|
|
|
|
|
| On the DTI and CCH cards, set the MB and MBR switches | ||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| DOWN . |
|
|
|
|
|
|
|
|
|
|
| Check whether the fault is still indicated or not. |
| |
|
|
|
|
|
|
|
|
|
| ||
Check by replacing the DTI card |
|
|
|
| On the DTI card, set the MBR switch UP and then MB switch | ||||||
|
|
|
| ||||||||
with spare |
|
| UP . |
|
| ||||||
|
|
|
|
|
|
|
|
| Extract the card from the mounting slot. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| On a new DTI card, make switch setting referring to the | ||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| extracted card. |
|
|
|
|
|
|
|
|
|
|
| On the new DTI card, set the MBR switch | UP . | |
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| On the new DTI card, set the MB switch | UP and insert the | |
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| card into the mounting slot. |
|
|
|
|
|
|
|
|
|
|
| On the new DTI card, set the MBR and MB switches DOWN . | ||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| Check whether the fault is still indicated or not. |
| |
|
|
|
|
|
|
|
|
|
| ||
Check by replacing the CCH/CCT |
|
|
| On the CCH/CCT card, set the MBR switch UP. |
| ||||||
|
|
|
| ||||||||
card with spare |
|
| Note : MBR switch s name varies depending on the card. | ||||||||
|
|
|
|
|
|
|
|
| On the CCH/CCT card, set the MB switch UP and extract the | ||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| card from its mounting slot. |
|
|
|
|
|
|
|
|
|
|
| Make switch setting on the new CCH/CCT card, referring to | ||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| the card extracted. |
|
|
|
|
|
|
|
|
|
|
| On the new CCH/CCT card, set the MBR and MB switches | ||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| UP and insert the card into its mounting slot. |
| |
|
|
|
|
|
|
|
|
| On the new CCH/CCT card, set the MB switch | DOWN . | |
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| On the new CCH/CCT card, set the MBR switch | DOWN . | |
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| Check whether the fault is still indicated. |
|
|
|
|
|
|
|
|
|
|
|
|
|
END
Page 115
Issue 2