![](/images/new-backgrounds/1140550/140550125x1.webp)
INSTALLATION TEST PROCEDURE
CHAPTER 5 INSTALLATION TEST PROCEDURE
1. GENERAL
This chapter describes the installation tests that are performed after system start up and after the office data has been assigned. The following test procedure are covered.
•Overall Test for CCIS Line
•CCIS Service Feature Functional Test
2.INSTALLATION TEST PROCEDURE 2.1 Overall Test for CCIS Line
Tests are to be performed to check CCIS Lines by connecting them to a trunk on an individual basis.
The speech path conditions (speech level, presence of noise,
•Overall Test Procedure
START
Overall Test of CCIS Tie Line Outgoing Call: | Paragraph 2.1.1 |
Overall Test of CCIS Tie Line Incoming Call: | Paragraph 2.1.2 |
Test of Connection and Alternate Routing to All Tie Lines: | Paragraph 2.1.3 |
Test of Tandem Connection to Tie Line: | Paragraph 2.1.4 |
PAD Setting: | Paragraph 2.1.5 |
END
Page 49
Issue 2