INSTALLATION TEST PROCEDURE

CHAPTER 5 INSTALLATION TEST PROCEDURE

1. GENERAL

This chapter describes the installation tests that are performed after system start up and after the office data has been assigned. The following test procedure are covered.

Overall Test for CCIS Line

CCIS Service Feature Functional Test

2.INSTALLATION TEST PROCEDURE 2.1 Overall Test for CCIS Line

Tests are to be performed to check CCIS Lines by connecting them to a trunk on an individual basis.

The speech path conditions (speech level, presence of noise, one-way speech, no speech, etc.) over the connection to the distant office will be checked. Release of the trunk used will also be checked.

Overall Test Procedure

START

Overall Test of CCIS Tie Line Outgoing Call:

Paragraph 2.1.1

Overall Test of CCIS Tie Line Incoming Call:

Paragraph 2.1.2

Test of Connection and Alternate Routing to All Tie Lines:

Paragraph 2.1.3

Test of Tandem Connection to Tie Line:

Paragraph 2.1.4

PAD Setting:

Paragraph 2.1.5

END

ND-71762 (E)CHAPTER 5

Page 49

Issue 2

Page 63
Image 63
NEC ND-71762(E) system manual Installation Test Procedure