INSTALLATION PROCEDURE

3. INSTALLATION PROCEDURE

3.1 General Flow of Installation Procedure

This section describes installation procedure divided into installation procedure items shown in Figure 4-1. The work flow and the reference paragraphs are shown below.

 

• For Digital CCIS Line

 

 

START

 

 

 

 

 

Setting of switch positions and

 

Refer to paragraph 3.2: “Setting of Switch Positions and

 

 

 

 

 

 

 

mounting of the circuit cards.

 

Mounting of the Circuit Cards”.

 

 

 

Cable running from the PBX to the

 

Refer to “Cable Running from the PBX to MDF,

 

 

 

 

 

 

 

MDF.

 

ATTCON, MAT, and SMDR” of the Installation

 

 

 

 

 

Manual.

 

 

 

Cable termination and cross

 

Refer to paragraph 3.3: “Cable Termination and Cross

 

 

 

 

 

 

 

connection from the MDF to the DSU.

 

Connection from the MDF to the DSU”.

 

 

 

Front cable connection between DTI

 

Refer to Figure 4-12 “Front Cable Connections between

 

 

 

 

 

 

 

and CCH.

 

DTI/CCT and CCH”.

END

For Analog CCIS Line

START

Setting of switch positions and mounting of the CCH card.

Cable Running from the PBX to the MODEM for Analog CCIS Line.

END

Refer to paragraph 3.2: “Setting of Switch Positions and Mounting of the Circuit Cards”.

Refer to paragraph 3.5: “Cable Running from PBX to the MODEM for Analog CCIS Line”.