INSTALLATION PROCEDURE
Figure 4-10 Cable Connection Diagram for Receiving Clock from a Digital Interface (TSW)
Cable Connection Diagram
Perform the following wirings at the MDF. The following connection diagram shows an example where the Digital Trunk POUT leads are used as the 1st clock distribution route.
PBX
maximum 200 meters (660feet) (24AWG)
Digital
Interface
TSW
PLO
LT Connector
Installation Cable
maximum100
meters(330 feet) (24AWG)
Installation Cable
RA
RB
TA
TB
POUTA
POUTB
DIU0A0
MDF
PCM Cable(2P)
Note 1
PCM
Carrier
Equipment/
DSU
to other node
CLK
PLO
#1
DIU0B0
DIU1A0
BASEU
for PLO #0 | #2 |
| |
| #3 |
| #4 |
| #1 |
for PLO #1 | #2 |
| |
| #3 |
| #4 |
DIU1B0
DIU2A0
DIU2B0
DIU3A0
DIU3B0
DIU0A1
DIU0B1
DIU1A1
DIU1B1
DIU2A1
DIU2B1
DIU3A1
DIU3B1
Note 2
Note 1: PLO has a maximum of 4 inputs. DIU0xx leads are used for the 1st clock distribution routs. Thus, DIU3xx leads are used for the 4th. The first input has the highest priority.
Note 2: This connection is required for a
Page 41
Issue 2