
INSTALLATION TEST PROCEDURE
2.2 CCIS Service Feature Functional Test
The purpose of this test is to verify that CCIS service features are programmed and operate as per the Job Specifi- cation.
For the operating procedure pertaining to each service feature, refer to CHAPTER 7: “List of Service Features for CCIS (1/2)”.
•CCIS Service Feature Functional Test Procedure
START
Test of Interoffice Station to Station Connection: | Paragraph 2.2.1 |
Test of Outgoing Call Connection to Tie Line Trunk: | Paragraph 2.2.2 |
Test of Transfer Services: | Paragraph 2.2.3 |
Test of Services from ATTCON: | Paragraph 2.2.4 |
Test of other Services: | Paragraph 2.2.5 |
END
CHAPTER 5 |
|
Page 58
Issue 2