Toshiba GD-1060 manual

Models: GD-1060

1 207
Download 207 pages 27.62 Kb
Page 164
Image 164

File number of the multi-polling job (indicated in 3 digits (001 ~ 999))

Date and time when the multi-polling job was received

Time when the multi-polling reception started

Time when the multi-polling reception was completed

Polling stations where the transmission was completed normally. Station’s name or facsimile/telephone number is indicated.

Polling station where an error occurred (indicated when an error occurs) Station’s name or facsimile/telephone number is indicated.

4

4-69

Page 164
Image 164
Toshiba GD-1060 manual