Trane Engineered Smoke Control System for Tracer Summit manual Checking outputs, BAS-APG001-EN

Models: BAS-APG001-EN Engineered Smoke Control System for Tracer Summit

1 156
Download 156 pages 43.26 Kb
Page 85
Image 85
Manual background

Checking outputs

3.Set the multi-meter to measure Vdc, then measure the voltage across the analog output at the signal and common screw terminals.

The measured voltage should be less than 0.1 Vdc. If the voltage is greater than this, a shared power supply may be incorrectly con- nected. Check along the wire to make sure that no additional connec- tions have been made.

BAS-APG001-EN

73

Page 85
Image 85
Trane Engineered Smoke Control System for Tracer Summit manual Checking outputs, BAS-APG001-EN