FORM
TABLE 34 – LEAVING CHILLED LIQUID CONTROL FOR 3 COMPRESSORS (SINGLE SYSTEM)
*STEP | COMP 1 | COMP 2 | COMP 3 |
|
0 | OFF | OFF | OFF |
|
1 | ON+HG | OFF | OFF | SEE NOTE 1 |
2 | ON | OFF | OFF |
|
|
|
|
|
|
3 | ON | ON | OFF |
|
4 | ON | ON | ON |
|
TABLE 35 – LEAVING CHILLED LIQUID CONTROL FOR 2 COMPRESSORS (SINGLE SYSTEM)
*STEP | COMP 1 | COMP 2 |
|
0 | OFF | OFF |
|
1 | ON+HG | OFF | SEE NOTE 1 |
2 | ON | OFF |
|
|
|
|
|
3 | ON | ON |
|
Notes:
1.Step 1 is Hot Gas Bypass and is skipped when loading occurs. Hot Gas Bypass operation is inhibited during Pumpdown. For Leaving Chilled Liquid Control the Hot Gas Bypass solenoid is energized only when the lead compressor is running and the LWT < SP, the Hot Gas Bypass solenoid is turned off when the LWT > SP + CR/2
2.Step 3 is skipped when loading occurs.
3.Step 4 is skipped when unloading occurs.
* STEP can be viewed using the OPER DATA key and scrolling to COOLING DEMAND.
2
YORK INTERNATIONAL | 87 |