Honeywell
SG-60
installation and operation guide
Model SGF-60 Flashhead
Troubleshooting
Specifications
Install
SGF-60 Digital Board Schematic
9LCA Alarm Card C1
Black wire Photocell
System Configuration
SGC-60 Replacement Transformer
Safety Precautions
Safety
Page 11
Airport Systems
Figure
1-2:
Model
SGF-60
Flashhead
SG-60
High Intensity Strobe System
1-3
Manual
EPM-00000019
Rev A
Page 10
Page 12
Image 11
Page 10
Page 12
Contents
Union Place Simi Valley, CA Phone 805 Fax 805
Manual Number EPM-00000019-001
Approved Date
Rev Comment
Disclaimers
Table of Contents
Troubleshooting Maintenance
Safety Information
Qualified Personnel
EPM-00000019-001 Vii Rev a
General Description
Scope
Model SGC-60 Master Controller
Model SGF-60 Flashhead
Safety Precautions
Airport Systems
Specifications
Flashhead Fail
System Configuration
System Controls
Power Configuration
Configuration Switches
Airport Systems
Condition 1 You have a Catenary System
Flashtube Installation
Flashtube Installation
Setting the Flashhead Elevation
Airport Systems
Master Controller Mounting Dimensions
Flashhead Outline and Mounting Dimensions
Typical Wiring Installation
Installation Wiring
Blue wire
Black wire Photocell
White wire Photocell
Red wire Photocell
Responding to Top Red Beacon Failures
Controlling the Red Light System
Master Controller TB3-C4
Master Controller TB5-NO4
9LCA Alarm Card NC1
9LCA Alarm Card C1
Procedures for installation of conduit and tower wiring
Flex Conduit Typical Installation Layout
Airport Systems
Airport Systems
Flex Conduit Installation
Junction Box Wiring Details
Flex Conduit Installation Detail
WC000001 Cable Overview
Splicing Details for WC000001 Cable
Airport Systems
Airport Systems
10 Flashhead Cable
10 Master Controller Circuit Board
11 Flashhead Digital Control Board
Final Installation Check
Power Up and System Tests
If SW2-2 is set for no External RED system OFF then
If SW2-2 is set for an External RED system ON, then
Day Mode
Night Mode
Twilight Mode
Airport Systems
Airport Systems
Airport Systems
SGF-60 Flashhead
Overall Description
Airport Systems
Airport Systems
Communications
Power Supplies
Mode Selection
Flash Feedback
Flash Control
Flashtube Triggering
High Voltage Rectification
SGC-60 Master Controller
Airport Systems
Airport Systems
Master Controller Board Schematic
SGF-60 Flashhead System Schematic
SGF-60 Digital Board Schematic
SGF-60 Trigger/High-Voltage Board Schematic
Troubleshooting
RLC
General Troubleshooting All Flashheads Stuck in Day Mode
General Troubleshooting Flashhead Does Not Flash
General Troubleshooting Flashhead Stuck in Day Mode
Dual System-Specific Troubleshooting
Catenary System-Specific Troubleshooting Chart
SGC-60 Replacement Transformer
White wire to the outer bottom right terminal
Flashtube Installation Ambient Light Sensor Photocell
Description Part Number
Replacement Parts
SG-60 AOL Power Supply Component Location
SG-60 AOL Flashhead Mounting Dimensions
SG-60 AOL Power Supply Mounting Dimensions
SG-60 AOL Wiring Installation
SG-60 AOL Flashhead Component Locations
SG-60 AOL Power Supply Component Locations
SG-60 AOL Schematic
Related pages
Troubleshooting for Initio INI-9090U
2Product Specifications Rev. B for Epson L90
Indicator light for Zanussi ZSF 4112
Flowchart 2.7-No Video, Part for HP NX9500
How to Remove Packaging Tape for GE JRP 28
For Sears professional installation of home for Sears 917.28858
Parts List & Diagram D Crankcase Cover for Harbor Freight Tools 67596
Additional information Language code list for Pioneer DV-466-K
Installing the Cooling Shroud for Dell R210
Important Safety Instructions for Citizen Systems iDP3110
How do I access the main page of the
TL-SL2218WEB switch
?
Top
Page
Image
Contents