Honeywell SG-60 installation and operation guide Catenary System-Specific Troubleshooting Chart

Page 70

Airport Systems

All Flashheads flash too

slow (40 flashes per

minute).

No

Does MC show

Green FH Status

 

 

LED for each

 

working FH?

 

 

Yes

 

 

 

 

 

Set MC switch SW-2 to

on.

All Flashheads are

flashing together, but not in catenary pattern.

No

Does MC show

Green FH Status

 

 

LED for each

 

working FH?

 

 

Yes

 

 

 

 

 

For each top-level FH:

Set DB switch SW2-1 to on Set DB switch W2-2 to off

For each bottom-level FH: Set DB switch SW2-1 to off Set DB switch SW2-1 to off

For each mid-level FH:

Set DB switch SW2-1 to on Set DB switch SW2-2 to on

See General System

Troubleshooting

A Flashhead is out of sync with its catenary level.

No

Does MC show

Green FH Status

 

 

LED for that FH?

 

 

Yes

 

 

 

 

 

If FH is on top level: Set DB SW2-1 to on Set DB SW2-2 to off

If FH is on bottom level: Set DB SW2-1 to off Set DB SW2-2 to on

If FH is on middle level: Set DB SW2-2 to on Set BD SW2-2 to on

Figure 4-5: Catenary System-Specific Troubleshooting Chart

SG-60 High Intensity Strobe System

4-7

Manual EPM-00000019 Rev A

Image 70
Contents Manual Number EPM-00000019-001 Union Place Simi Valley, CA Phone 805 Fax 805Rev Comment Approved DateDisclaimers Table of Contents Troubleshooting Maintenance Safety Information Qualified Personnel EPM-00000019-001 Vii Rev a Scope General DescriptionModel SGC-60 Master Controller Model SGF-60 Flashhead Safety Precautions Airport Systems Specifications Flashhead Fail System Configuration Configuration Switches Power ConfigurationSystem Controls Airport Systems Condition 1 You have a Catenary System Flashtube Installation Flashtube Installation Setting the Flashhead Elevation Airport Systems Master Controller Mounting Dimensions Flashhead Outline and Mounting Dimensions Installation Wiring Typical Wiring InstallationRed wire Photocell Black wire PhotocellWhite wire Photocell Blue wireMaster Controller TB5-NO4 Controlling the Red Light SystemMaster Controller TB3-C4 Responding to Top Red Beacon Failures9LCA Alarm Card C1 9LCA Alarm Card NC1Flex Conduit Typical Installation Layout Procedures for installation of conduit and tower wiringAirport Systems Airport Systems Flex Conduit Installation Junction Box Wiring Details Flex Conduit Installation Detail Splicing Details for WC000001 Cable WC000001 Cable OverviewAirport Systems Airport Systems 10 Flashhead Cable 10 Master Controller Circuit Board 11 Flashhead Digital Control Board Final Installation Check Power Up and System Tests If SW2-2 is set for an External RED system ON, then If SW2-2 is set for no External RED system OFF thenDay Mode Twilight Mode Night ModeAirport Systems Airport Systems Airport Systems Overall Description SGF-60 FlashheadAirport Systems Airport Systems Power Supplies CommunicationsMode Selection Flash Control Flash FeedbackHigh Voltage Rectification Flashtube TriggeringSGC-60 Master Controller Airport Systems Airport Systems Master Controller Board Schematic SGF-60 Flashhead System Schematic SGF-60 Digital Board Schematic SGF-60 Trigger/High-Voltage Board Schematic Troubleshooting RLC General Troubleshooting All Flashheads Stuck in Day Mode General Troubleshooting Flashhead Does Not Flash General Troubleshooting Flashhead Stuck in Day Mode Dual System-Specific Troubleshooting Catenary System-Specific Troubleshooting Chart SGC-60 Replacement Transformer White wire to the outer bottom right terminal Flashtube Installation Ambient Light Sensor Photocell Replacement Parts Description Part NumberSG-60 AOL Power Supply Component Location SG-60 AOL Flashhead Mounting Dimensions SG-60 AOL Power Supply Mounting Dimensions SG-60 AOL Wiring Installation SG-60 AOL Flashhead Component Locations SG-60 AOL Power Supply Component Locations SG-60 AOL Schematic