Honeywell SG-60 installation and operation guide Flashtube Installation

Page 20

Airport Systems

SW3 – (Figure 2-11, Item 3, Page 2-26) Used to specify the ID number for the Flashhead. Each Flashhead must be set with a unique ID number as indicated on the installation drawings. There is a diagram next to the switch showing the values for the switch. The ID number is the total of the values of the switches set to OFF (negative binary). For example, to set ID #10, set SW3-2 (value 2) OFF (down) and SW3-4 (value 8) OFF (down) for a total of 10 (2+8).

§SW3-1 – Set to OFF (down) for value 1

§SW3-2 – Set to OFF (down) for value 2

§SW3-3 – Set to OFF (down) for value 4

§SW3-4 – Set to OFF (down) for value 8

§SW3-5 – Set to OFF (down) for value 16

SW4 – (Figure 2-11, Item 5, Page 2-26) This is used for the terminating resistor on the communications line.

§SW4-1 – Set to ON (up) for terminating resistor. This should be set ON only for the Flashhead where the communication lines are terminated. In a typical installation, the communications lines are terminated at the Master Controller and the upper most Flashhead. In systems with an AOL, the AOL is typically the upper most Flashhead. In systems without an AOL, any one but only one of the Flashheads at the top level can be set to ON. For all others, set to OFF. If the system is being installed in stages as the tower is erected, SW4-1 should be set ON for one of the flashheads at the highest installed level. As additional flashheads are added at higher levels, adjust the configuration by setting SW4-1 to OFF in the previous flashhead and set SW4-1 to ON for one of the flashheads at the highest installed level.

2.2.2.3Flashtube Installation

The Flashheads are shipped from the factory without the flashtubes installed to prevent damage during shipping. Install the flashtubes per the following procedure:

1.If Flashhead is already wired to AC power: Shut off the power to the system by opening the main AC power circuit breakers.

2.Release the Flashhead cover latches.

3.Swing the cover open, exercising caution not to damage the glass face or the gasket.

4.Unpack the flashtube. Do not touch the glass envelope - contamination from a fingerprint will degrade the reliability of the flashtube.

5.Holding the flashtube by its metal ends, center it in the reflector assembly and snap it into place. Make sure the red mark on the flashtube matches the red mark on the socket assembly.

6.Attach the fast-on connector at each end of the flashtube to each socket assembly. Make sure wires are not twisted - the metal to glass bond is fragile.

SG-60 High Intensity Strobe System

2-5

Manual EPM-00000019 Rev A

Image 20
Contents Manual Number EPM-00000019-001 Union Place Simi Valley, CA Phone 805 Fax 805Rev Comment Approved DateDisclaimers Table of Contents Troubleshooting Maintenance Safety Information Qualified Personnel EPM-00000019-001 Vii Rev a Scope General DescriptionModel SGC-60 Master Controller Model SGF-60 Flashhead Safety Precautions Airport Systems Specifications Flashhead Fail System Configuration System Controls Power ConfigurationConfiguration Switches Airport Systems Condition 1 You have a Catenary System Flashtube Installation Flashtube Installation Setting the Flashhead Elevation Airport Systems Master Controller Mounting Dimensions Flashhead Outline and Mounting Dimensions Installation Wiring Typical Wiring InstallationBlack wire Photocell White wire PhotocellRed wire Photocell Blue wireControlling the Red Light System Master Controller TB3-C4Master Controller TB5-NO4 Responding to Top Red Beacon Failures9LCA Alarm Card C1 9LCA Alarm Card NC1Flex Conduit Typical Installation Layout Procedures for installation of conduit and tower wiringAirport Systems Airport Systems Flex Conduit Installation Junction Box Wiring Details Flex Conduit Installation Detail Splicing Details for WC000001 Cable WC000001 Cable OverviewAirport Systems Airport Systems 10 Flashhead Cable 10 Master Controller Circuit Board 11 Flashhead Digital Control Board Final Installation Check Power Up and System Tests If SW2-2 is set for an External RED system ON, then If SW2-2 is set for no External RED system OFF thenDay Mode Twilight Mode Night ModeAirport Systems Airport Systems Airport Systems Overall Description SGF-60 FlashheadAirport Systems Airport Systems Power Supplies CommunicationsMode Selection Flash Control Flash FeedbackHigh Voltage Rectification Flashtube TriggeringSGC-60 Master Controller Airport Systems Airport Systems Master Controller Board Schematic SGF-60 Flashhead System Schematic SGF-60 Digital Board Schematic SGF-60 Trigger/High-Voltage Board Schematic Troubleshooting RLC General Troubleshooting All Flashheads Stuck in Day Mode General Troubleshooting Flashhead Does Not Flash General Troubleshooting Flashhead Stuck in Day Mode Dual System-Specific Troubleshooting Catenary System-Specific Troubleshooting Chart SGC-60 Replacement Transformer White wire to the outer bottom right terminal Flashtube Installation Ambient Light Sensor Photocell Replacement Parts Description Part NumberSG-60 AOL Power Supply Component Location SG-60 AOL Flashhead Mounting Dimensions SG-60 AOL Power Supply Mounting Dimensions SG-60 AOL Wiring Installation SG-60 AOL Flashhead Component Locations SG-60 AOL Power Supply Component Locations SG-60 AOL Schematic