Honeywell SG-60 installation and operation guide 9LCA Alarm Card C1, 9LCA Alarm Card NC1

Page 29

Airport Systems

If your red light system has a Honeywell 9LCA Series Red Light Controller, locate the Alarm terminals and Flasher Bypass terminals corresponding to the top beacon, and make the following connections:

Master Controller TB6-1 -----------------

to ----------------------

9LCA Flasher Bypass C1

9LCA Flasher Bypass NC1 -------------

to ----------------------------

9LCA Alarm Card C1

Master Controller TB6-2 -----------------

to --------------------------

9LCA Alarm Card NC1

Note: Usually the top beacon terminals are found on the top/left Flasher Bypass Card (TB4), and the left channel of the top Alarm Card (TB3).

Other Red Light Systems may require different connections. Refer the to Tower Kit drawing (if both systems were provided as a kit by Honeywell), the Red Light System's manual, or contact Honeywell for assistance.

2.4.5Flashhead Wiring

Incoming AC power and data communications enter the Flashhead in a single cable, Honeywell P/N WC000001, that combines three wires for AC power with a twisted-pair/double-shielded data cable (See Figure 2-9, Page 2-21). Typically, Flashheads are supplied with a 10-20 foot length of this cable already installed.

Should you need to install or replace this cable, make the connections for incoming AC power and data to Flashhead TB1 per Figure 2-5, Page 2-11, and Figure 2-10, Page 2- 24, as follows.

Green wire (Equipment ground) ------------------------

to

----------------- Flashhead TB1-1

White wire (Phase or neutral) ---------------------------

to

----------------- Flashhead TB1-2

Black wire (Phase or hi) ----------------------------------

to

----------------- Flashhead TB1-3

Data Cable

 

 

White or Clear wire (Data signal "A") ------------

to

----------------- Flashhead TB1-4

Blue wire (Data signal "B") --------------------------

to

----------------- Flashhead TB1-5

Inner shield (Data shield)----------------------------

to

----------------- Flashhead TB1-6

Outer shield --------------------------------------------------------

trim short; not connected

2.4.6Conduit and Tower Wiring Detail

This section details a standard practice of installing conduit and the related tower lighting wires for the system. Please use this guide to help install the wires into the conduit system. The wires and cables for the SG-60 High Intensity system need to be run properly to insure that the system will work properly. Wire insulation that is damaged will lead to a system that will not function properly and may void the warranty. Insure that the following procedure is followed. Pay close attention to all bold text.

SG-60 High Intensity Strobe System

2-14

Manual EPM-00000019 Rev A

Image 29
Contents Union Place Simi Valley, CA Phone 805 Fax 805 Manual Number EPM-00000019-001Approved Date Rev CommentDisclaimers Table of Contents Troubleshooting Maintenance Safety Information Qualified Personnel EPM-00000019-001 Vii Rev a General Description ScopeModel SGC-60 Master Controller Model SGF-60 Flashhead Safety Precautions Airport Systems Specifications Flashhead Fail System Configuration System Controls Power ConfigurationConfiguration Switches Airport Systems Condition 1 You have a Catenary System Flashtube Installation Flashtube Installation Setting the Flashhead Elevation Airport Systems Master Controller Mounting Dimensions Flashhead Outline and Mounting Dimensions Typical Wiring Installation Installation WiringWhite wire Photocell Black wire PhotocellRed wire Photocell Blue wireMaster Controller TB3-C4 Controlling the Red Light SystemMaster Controller TB5-NO4 Responding to Top Red Beacon Failures9LCA Alarm Card NC1 9LCA Alarm Card C1Procedures for installation of conduit and tower wiring Flex Conduit Typical Installation LayoutAirport Systems Airport Systems Flex Conduit Installation Junction Box Wiring Details Flex Conduit Installation Detail WC000001 Cable Overview Splicing Details for WC000001 CableAirport Systems Airport Systems 10 Flashhead Cable 10 Master Controller Circuit Board 11 Flashhead Digital Control Board Final Installation Check Power Up and System Tests If SW2-2 is set for no External RED system OFF then If SW2-2 is set for an External RED system ON, thenDay Mode Night Mode Twilight ModeAirport Systems Airport Systems Airport Systems SGF-60 Flashhead Overall DescriptionAirport Systems Airport Systems Communications Power SuppliesMode Selection Flash Feedback Flash ControlFlashtube Triggering High Voltage RectificationSGC-60 Master Controller Airport Systems Airport Systems Master Controller Board Schematic SGF-60 Flashhead System Schematic SGF-60 Digital Board Schematic SGF-60 Trigger/High-Voltage Board Schematic Troubleshooting RLC General Troubleshooting All Flashheads Stuck in Day Mode General Troubleshooting Flashhead Does Not Flash General Troubleshooting Flashhead Stuck in Day Mode Dual System-Specific Troubleshooting Catenary System-Specific Troubleshooting Chart SGC-60 Replacement Transformer White wire to the outer bottom right terminal Flashtube Installation Ambient Light Sensor Photocell Description Part Number Replacement PartsSG-60 AOL Power Supply Component Location SG-60 AOL Flashhead Mounting Dimensions SG-60 AOL Power Supply Mounting Dimensions SG-60 AOL Wiring Installation SG-60 AOL Flashhead Component Locations SG-60 AOL Power Supply Component Locations SG-60 AOL Schematic