Honeywell SG-60 installation and operation guide Airport Systems

Page 48

Airport Systems

2.6.5Verify Photocell Operation Connected to Controller

1.Verify proper mounting and orientation of photocell. Photocell shall face toward the polar sky (e.g., North in the northern hemisphere), not toward the sun.

2.Set LOCAL / REMOTE switch to REMOTE.

3.Verify that the correct Mode status LED (DS25 - DS27 Figure 2-10, Item 3, Page 2-25) is lit red according to the ambient light conditions (during normal daylight, DS25 shall be lit red).

4.Completely cover photocell (use a glove or hat, for example).

5.Verify Night Mode status LED DS27 is lit red.

6.Verify all other LEDs are in normal operating condition.

7.Verify that the Tower Lighting System is operating in normal night mode per 2.6.4.3. (Steps 2 through 6 only)

8.Uncover the photocell to expose it to ambient light.

9.Verify Mode status LEDs are in normal status for current ambient light conditions (during normal daylight, DS25 shall be lit red and DS26 and DS27 shall be unlit).

2.6.6Verify Photocell Operation Not Connected to Controller

15.Disconnect connector TB2 from PCB1 in the Master Controller.

16.Verify all Flashhead LEDs (DS1 - DS24) are lit red.

17.Verify Photocell status LED DS28 (Figure 2-10, Item 3, Page 2-25) is lit red.

18.Verify Photocell alarm LED DS30 (Figure 2-10, Item 5, Page 2-25) is un- lit.

19.Verify all Flashheads are operating in Day mode (maximum brightness). The Flashheads will very slowly drift out of sync.

20.Reconnect connector TB2 to PCB1 in the Master Controller.

21.Verify that the Flashhead Status LED for each Flashhead on the tower is lit green (including any AOL). Unused Flashhead status LEDs shall be off. (DS1 - DS24: Figure 2-10, Item 4, Page 2-25)

22.Verify Photocell status LED DS28 (Figure 2-10, Item 3, Page 2-25) is lit green.

23.Verify Photocell alarm LED DS30 (Figure 2-10, Item 5, Page 2-25) is lit green.

If the system passed all of the tests in Sections 2.6.3 - 2.6.6 above, the Master Controller, photocell and tower wiring were installed properly and the system is ready

SG-60 High Intensity Strobe System

2-33

Manual EPM-00000019 Rev A

Image 48
Contents Manual Number EPM-00000019-001 Union Place Simi Valley, CA Phone 805 Fax 805Rev Comment Approved DateDisclaimers Table of Contents Troubleshooting Maintenance Safety Information Qualified Personnel EPM-00000019-001 Vii Rev a Scope General DescriptionModel SGC-60 Master Controller Model SGF-60 Flashhead Safety Precautions Airport Systems Specifications Flashhead Fail System Configuration Power Configuration Configuration SwitchesSystem Controls Airport Systems Condition 1 You have a Catenary System Flashtube Installation Flashtube Installation Setting the Flashhead Elevation Airport Systems Master Controller Mounting Dimensions Flashhead Outline and Mounting Dimensions Installation Wiring Typical Wiring InstallationBlack wire Photocell White wire PhotocellRed wire Photocell Blue wireControlling the Red Light System Master Controller TB3-C4Master Controller TB5-NO4 Responding to Top Red Beacon Failures9LCA Alarm Card C1 9LCA Alarm Card NC1Flex Conduit Typical Installation Layout Procedures for installation of conduit and tower wiringAirport Systems Airport Systems Flex Conduit Installation Junction Box Wiring Details Flex Conduit Installation Detail Splicing Details for WC000001 Cable WC000001 Cable OverviewAirport Systems Airport Systems 10 Flashhead Cable 10 Master Controller Circuit Board 11 Flashhead Digital Control Board Final Installation Check Power Up and System Tests If SW2-2 is set for an External RED system ON, then If SW2-2 is set for no External RED system OFF thenDay Mode Twilight Mode Night ModeAirport Systems Airport Systems Airport Systems Overall Description SGF-60 FlashheadAirport Systems Airport Systems Power Supplies CommunicationsMode Selection Flash Control Flash FeedbackHigh Voltage Rectification Flashtube TriggeringSGC-60 Master Controller Airport Systems Airport Systems Master Controller Board Schematic SGF-60 Flashhead System Schematic SGF-60 Digital Board Schematic SGF-60 Trigger/High-Voltage Board Schematic Troubleshooting RLC General Troubleshooting All Flashheads Stuck in Day Mode General Troubleshooting Flashhead Does Not Flash General Troubleshooting Flashhead Stuck in Day Mode Dual System-Specific Troubleshooting Catenary System-Specific Troubleshooting Chart SGC-60 Replacement Transformer White wire to the outer bottom right terminal Flashtube Installation Ambient Light Sensor Photocell Replacement Parts Description Part NumberSG-60 AOL Power Supply Component Location SG-60 AOL Flashhead Mounting Dimensions SG-60 AOL Power Supply Mounting Dimensions SG-60 AOL Wiring Installation SG-60 AOL Flashhead Component Locations SG-60 AOL Power Supply Component Locations SG-60 AOL Schematic