Honeywell SG-60 White wire to the outer bottom right terminal, SGF-60 Flashhead

Page 72

Airport Systems

10.Attach wires with the push on connectors to the following terminals.

(a)White wire to the outer bottom right terminal

(b)Black wire to the terminal that matches the Controller input voltage. (240v shown in Figure 5-1.)

11.You will need to replace the terminal lugs on the other 2 white wires before attaching to the transformer.

(a)Cut off wire terminal lugs as close to lug as possible

(b)Strip insulation back and crimp on new push on connectors.

12.Attach White wires with new connectors to the upper back terminals shown in diagram.

13.Re-install switch panel assembly to standoffs.

14.Visually inspect for loose connectors or any short-circuited lines.

15.Apply power to the Controller from the Circuit breaker.

16.Set Controller power switch to on and verify normal operation.

5.2SGF-60 Flashhead

Normal maintenance of the Flashhead requires periodic cleaning of the window with a non-abrasive soap.

WARNING!

Ensure that the power is off and the energy storage capacitors have been discharged before opening the Flashhead. Do not put hands or tools in the Flashhead until the High Voltage Indicator neon lamp DS1 on the High Voltage & Trigger board is extinguished. Refer to Figure 1-2, Page 1-3, for the location of High Voltage Indicator DS1 - do not confuse the High Voltage Indicator DS1, with the PWR ON lamp DS1.

Note that it is possible for the High Voltage Indicator DS1 to be lit even when the PWR ON lamp DS1 if off. If this happens, the energy storage capacitors C1 - C3 must be discharged before performing maintenance.

5.2.1Flashtube Replacement

Flashtubes that are faulty or degraded in performance by aging shall be replaced per the following procedure:

1.Shut off the power to the system by opening the main AC power circuit breakers.

2.Release the Flashhead cover latches.

3.Swing the cover open, exercising caution not to damage the glass face or the gasket.

4.Release the old flashtube by disconnecting the electrode wire fastons at each end and carefully snapping the flashtube from its holders.

SG-60 High Intensity Strobe System

5-2

Manual EPM-00000019 Rev A

Image 72
Contents Manual Number EPM-00000019-001 Union Place Simi Valley, CA Phone 805 Fax 805Rev Comment Approved DateDisclaimers Table of Contents Troubleshooting Maintenance Safety Information Qualified Personnel EPM-00000019-001 Vii Rev a Scope General DescriptionModel SGC-60 Master Controller Model SGF-60 Flashhead Safety Precautions Airport Systems Specifications Flashhead Fail System Configuration Power Configuration Configuration SwitchesSystem Controls Airport Systems Condition 1 You have a Catenary System Flashtube Installation Flashtube Installation Setting the Flashhead Elevation Airport Systems Master Controller Mounting Dimensions Flashhead Outline and Mounting Dimensions Installation Wiring Typical Wiring InstallationBlack wire Photocell White wire PhotocellRed wire Photocell Blue wireControlling the Red Light System Master Controller TB3-C4Master Controller TB5-NO4 Responding to Top Red Beacon Failures9LCA Alarm Card C1 9LCA Alarm Card NC1Flex Conduit Typical Installation Layout Procedures for installation of conduit and tower wiringAirport Systems Airport Systems Flex Conduit Installation Junction Box Wiring Details Flex Conduit Installation Detail Splicing Details for WC000001 Cable WC000001 Cable OverviewAirport Systems Airport Systems 10 Flashhead Cable 10 Master Controller Circuit Board 11 Flashhead Digital Control Board Final Installation Check Power Up and System Tests If SW2-2 is set for an External RED system ON, then If SW2-2 is set for no External RED system OFF thenDay Mode Twilight Mode Night ModeAirport Systems Airport Systems Airport Systems Overall Description SGF-60 FlashheadAirport Systems Airport Systems Power Supplies CommunicationsMode Selection Flash Control Flash FeedbackHigh Voltage Rectification Flashtube TriggeringSGC-60 Master Controller Airport Systems Airport Systems Master Controller Board Schematic SGF-60 Flashhead System Schematic SGF-60 Digital Board Schematic SGF-60 Trigger/High-Voltage Board Schematic Troubleshooting RLC General Troubleshooting All Flashheads Stuck in Day Mode General Troubleshooting Flashhead Does Not Flash General Troubleshooting Flashhead Stuck in Day Mode Dual System-Specific Troubleshooting Catenary System-Specific Troubleshooting Chart SGC-60 Replacement Transformer White wire to the outer bottom right terminal Flashtube Installation Ambient Light Sensor Photocell Replacement Parts Description Part NumberSG-60 AOL Power Supply Component Location SG-60 AOL Flashhead Mounting Dimensions SG-60 AOL Power Supply Mounting Dimensions SG-60 AOL Wiring Installation SG-60 AOL Flashhead Component Locations SG-60 AOL Power Supply Component Locations SG-60 AOL Schematic