2.5Final Installation Check

Before applying power to the equipment, perform the procedures in Sections 2.5.1 -

2.5.4.If any test does not pass, please consult SECTION 4. TROUBLESHOOTING in this manual or call Honeywell Technical Support at (805) 581-5591.

2.5.1Preliminary

1.Verify that all AC input power circuit breakers are turned off.

2.Check that all printed circuit boards are properly seated in their sockets, and retaining brackets are securely fastened..

3.Check that any user-installed wiring does not interfere with relay operation when covers are closed.

4.Check that all Flashheads are mounted are mounted at the correct elevation per Section 2.3.2.1, Page 2-7. Check that all Flashhead covers are shut properly for a weather-tight seal with all latches closed.

5.Set Master Controller switches as follows:

POWER SWITCH -----------------------------------------------------------------

OFF

LOCAL / REMOTE Switch ---------------------------------------------------

LOCAL

MODE Switch -----------------------------------------------------------------------

DAY

2.5.2Verify Correct Wiring in Master Controller

Verify correct wiring of the Master Controller as specified in section 2.4 page 2-11.

2.5.3Verifying Photocell Wiring

Verify correct wiring of the photocell as specified in section 2.4.3 page 2-12.

2.5.4Verify Proper Tower Wiring for Data/Control Cable

This test assumes a typical tower configuration with the data cable terminating at the Master Controller.

1.Unplug Data Cable connector TB5 from PCB1 in Master Controller.

2.Verify 120-140 ohms resistance between TB5-A and TB5-B on the Data Cable. (This checks that a single 100-ohm data line termination resistor is in the circuit. Resistance of 70 ohms or less indicates that more than one Flashhead has the terminating resistor switch set to on. See SW4 page 2-5.

3.Verify open circuit by measuring resistance between TB5-S on the Data Cable and panel ground.

4.Verify open circuit between TB5-A on the Data Cable and panel ground.

5.Verify open circuit between TB5-B on the Data Cable and panel ground.

SG-60 High Intensity Strobe System

2-27

Manual EPM-00000019 Rev A

Image 42
Contents Manual Number EPM-00000019-001 Union Place Simi Valley, CA Phone 805 Fax 805Rev Comment Approved DateDisclaimers Table of Contents Troubleshooting Maintenance Safety Information Qualified Personnel EPM-00000019-001 Vii Rev a Scope General DescriptionModel SGC-60 Master Controller Model SGF-60 Flashhead Safety Precautions Airport Systems Specifications Flashhead Fail System Configuration Power Configuration Configuration SwitchesSystem Controls Airport Systems Condition 1 You have a Catenary System Flashtube Installation Flashtube Installation Setting the Flashhead Elevation Airport Systems Master Controller Mounting Dimensions Flashhead Outline and Mounting Dimensions Installation Wiring Typical Wiring InstallationRed wire Photocell Black wire PhotocellWhite wire Photocell Blue wireMaster Controller TB5-NO4 Controlling the Red Light SystemMaster Controller TB3-C4 Responding to Top Red Beacon Failures9LCA Alarm Card C1 9LCA Alarm Card NC1Flex Conduit Typical Installation Layout Procedures for installation of conduit and tower wiringAirport Systems Airport Systems Flex Conduit Installation Junction Box Wiring Details Flex Conduit Installation Detail Splicing Details for WC000001 Cable WC000001 Cable OverviewAirport Systems Airport Systems 10 Flashhead Cable 10 Master Controller Circuit Board 11 Flashhead Digital Control Board Final Installation Check Power Up and System Tests If SW2-2 is set for an External RED system ON, then If SW2-2 is set for no External RED system OFF thenDay Mode Twilight Mode Night ModeAirport Systems Airport Systems Airport Systems Overall Description SGF-60 FlashheadAirport Systems Airport Systems Power Supplies CommunicationsMode Selection Flash Control Flash FeedbackHigh Voltage Rectification Flashtube TriggeringSGC-60 Master Controller Airport Systems Airport Systems Master Controller Board Schematic SGF-60 Flashhead System Schematic SGF-60 Digital Board Schematic SGF-60 Trigger/High-Voltage Board Schematic Troubleshooting RLC General Troubleshooting All Flashheads Stuck in Day Mode General Troubleshooting Flashhead Does Not Flash General Troubleshooting Flashhead Stuck in Day Mode Dual System-Specific Troubleshooting Catenary System-Specific Troubleshooting Chart SGC-60 Replacement Transformer White wire to the outer bottom right terminal Flashtube Installation Ambient Light Sensor Photocell Replacement Parts Description Part NumberSG-60 AOL Power Supply Component Location SG-60 AOL Flashhead Mounting Dimensions SG-60 AOL Power Supply Mounting Dimensions SG-60 AOL Wiring Installation SG-60 AOL Flashhead Component Locations SG-60 AOL Power Supply Component Locations SG-60 AOL Schematic