Airport Systems
2.5Final Installation Check
Before applying power to the equipment, perform the procedures in Sections 2.5.1 -
2.5.4.If any test does not pass, please consult SECTION 4. TROUBLESHOOTING in this manual or call Honeywell Technical Support at (805)
2.5.1Preliminary
1.Verify that all AC input power circuit breakers are turned off.
2.Check that all printed circuit boards are properly seated in their sockets, and retaining brackets are securely fastened..
3.Check that any
4.Check that all Flashheads are mounted are mounted at the correct elevation per Section 2.3.2.1, Page
5.Set Master Controller switches as follows:
POWER SWITCH | OFF |
LOCAL / REMOTE Switch | LOCAL |
MODE Switch | DAY |
2.5.2Verify Correct Wiring in Master Controller
Verify correct wiring of the Master Controller as specified in section 2.4 page
2.5.3Verifying Photocell Wiring
Verify correct wiring of the photocell as specified in section 2.4.3 page
2.5.4Verify Proper Tower Wiring for Data/Control Cable
This test assumes a typical tower configuration with the data cable terminating at the Master Controller.
1.Unplug Data Cable connector TB5 from PCB1 in Master Controller.
2.Verify
3.Verify open circuit by measuring resistance between
4.Verify open circuit between
5.Verify open circuit between