The Master Controller gives previously good Flashheads four chances to reply (addressing that Flashhead repeatedly), before marking them bad. Previously bad Flashheads are given one chance to reply OK before moving on to the next Flashhead.

The Master Controller checks the status of each Flashhead in order of increasing flashhead number, cycling repeatedly through the total number of selected Flashheads. You can set the number of Flashheads monitored using DIP Switch SW1. If the Master Controller is not monitoring a flashhead, the corresponding Flashhead Status LED is turned off.

If any Flashhead is marked bad (Red LED), the Master Controller will de-energize the Flashheads Alarm Relay K1 (TB3-C1, -NO1, -NC1), and turn off the corresponding LED (DS29).

3.3.3System Mode Selection

The master controller determines what mode to transmit with the Flash Request by reading the Photocell input and the Front Panel Switches.

If the Remote/Local Switch on the front panel switch is set to Local, the Master Controller will take its operating mode from the position of the Local Mode Select Switch (Day, Twilight, or Night).

If the Remote/Local Switch is set to Remote (Photocell), the Master Controller will take its operating mode from the analog reading of the photocell input to TB2 of the Master Controller Board. If the photocell fails, the Master Controller will automatically select Day Mode.

The Master Controller indicate its current Photo Mode by illuminating the Day, Twi, or Nite LEDs (DS25-DS27). If the Photocell fails (including open or short circuit), the PC OK LED (DS28) will turn red, and the Photocell Fail Relay (K2) will de-energize. If the photocell status is good, DS28 will be green and K2 will be energized.

If the Master Controller is configured for a Dual System (SW2-2 is On), uses the K4 relay to control the Red Light Controller. The Master Controller energizes K4 to turn the Red Lights off, and de-energizes K4 to turn the Red Lights on. As long as the Red Lights are operating normally, the Master Controller will request Off Mode from the Flashheads instead of Night Mode.

If the Red Light Controller signals a top beacon failure (by creating an open between TB6-1 and TB6-2), the Master Controller will request Night Mode from the Flashheads, and energize K4 to turn off down the remaining Red Lights. The Master Controller also energizes K5, the Backup Relay, to provide an indication that the Dual system has switched to White Night Backup.

Once the Master Controller has switched into White Night Backup, it will remains latched in that mode until switched into Twilight or Day Mode (either automatically or manually). If the Red Light Controller indicates is ready (DS36 is lit) at the next transition to into Night Mode, the Red Lights will be tried again. Typically, Red Light Systems (such as the Honeywell 9LCA series) do not report any Beacon Failures

SG-60 High Intensity Strobe System

3-9

Manual EPM-00000019 Rev A

Image 58
Contents Manual Number EPM-00000019-001 Union Place Simi Valley, CA Phone 805 Fax 805Rev Comment Approved DateDisclaimers Table of Contents Troubleshooting Maintenance Safety Information Qualified Personnel EPM-00000019-001 Vii Rev a Scope General DescriptionModel SGC-60 Master Controller Model SGF-60 Flashhead Safety Precautions Airport Systems Specifications Flashhead Fail System Configuration Configuration Switches Power ConfigurationSystem Controls Airport Systems Condition 1 You have a Catenary System Flashtube Installation Flashtube Installation Setting the Flashhead Elevation Airport Systems Master Controller Mounting Dimensions Flashhead Outline and Mounting Dimensions Installation Wiring Typical Wiring InstallationRed wire Photocell Black wire PhotocellWhite wire Photocell Blue wireMaster Controller TB5-NO4 Controlling the Red Light SystemMaster Controller TB3-C4 Responding to Top Red Beacon Failures9LCA Alarm Card C1 9LCA Alarm Card NC1Flex Conduit Typical Installation Layout Procedures for installation of conduit and tower wiringAirport Systems Airport Systems Flex Conduit Installation Junction Box Wiring Details Flex Conduit Installation Detail Splicing Details for WC000001 Cable WC000001 Cable OverviewAirport Systems Airport Systems 10 Flashhead Cable 10 Master Controller Circuit Board 11 Flashhead Digital Control Board Final Installation Check Power Up and System Tests If SW2-2 is set for an External RED system ON, then If SW2-2 is set for no External RED system OFF thenDay Mode Twilight Mode Night ModeAirport Systems Airport Systems Airport Systems Overall Description SGF-60 FlashheadAirport Systems Airport Systems Power Supplies CommunicationsMode Selection Flash Control Flash FeedbackHigh Voltage Rectification Flashtube TriggeringSGC-60 Master Controller Airport Systems Airport Systems Master Controller Board Schematic SGF-60 Flashhead System Schematic SGF-60 Digital Board Schematic SGF-60 Trigger/High-Voltage Board Schematic Troubleshooting RLC General Troubleshooting All Flashheads Stuck in Day Mode General Troubleshooting Flashhead Does Not Flash General Troubleshooting Flashhead Stuck in Day Mode Dual System-Specific Troubleshooting Catenary System-Specific Troubleshooting Chart SGC-60 Replacement Transformer White wire to the outer bottom right terminal Flashtube Installation Ambient Light Sensor Photocell Replacement Parts Description Part NumberSG-60 AOL Power Supply Component Location SG-60 AOL Flashhead Mounting Dimensions SG-60 AOL Power Supply Mounting Dimensions SG-60 AOL Wiring Installation SG-60 AOL Flashhead Component Locations SG-60 AOL Power Supply Component Locations SG-60 AOL Schematic