Honeywell SG-60 Flashtube Installation Ambient Light Sensor Photocell

Page 73

Airport Systems

5.Unpack the new flashtube. Do not touch the glass envelope - contamination from a fingerprint will degrade the reliability of the flashtube.

6.Holding the flashtube by its metal ends, center it in the reflector assembly and snap it into place. Make sure the red mark on the flashtube matches the red mark on the socket assembly.

7.Attach the faston connector at each end of the flashtube to each socket assembly. Make sure wires are not twisted - the metal to glass bond is fragile.

8.Refer to Figure 5-2 below. Dress the electrode wires away from the sides of the reflector.

9.Close and fasten the Flashhead cover.

Figure 5-2: Flashtube Installation

5.3Ambient Light Sensor (Photocell)

The only maintenance required for the photocell is periodic cleaning. The frequency of cleaning depends on the environment to which the photocell is exposed.

SG-60 High Intensity Strobe System

5-3

Manual EPM-00000019 Rev A

Image 73
Contents Union Place Simi Valley, CA Phone 805 Fax 805 Manual Number EPM-00000019-001Approved Date Rev CommentDisclaimers Table of Contents Troubleshooting Maintenance Safety Information Qualified Personnel EPM-00000019-001 Vii Rev a General Description ScopeModel SGC-60 Master Controller Model SGF-60 Flashhead Safety Precautions Airport Systems Specifications Flashhead Fail System Configuration Configuration Switches Power ConfigurationSystem Controls Airport Systems Condition 1 You have a Catenary System Flashtube Installation Flashtube Installation Setting the Flashhead Elevation Airport Systems Master Controller Mounting Dimensions Flashhead Outline and Mounting Dimensions Typical Wiring Installation Installation WiringWhite wire Photocell Black wire PhotocellRed wire Photocell Blue wireMaster Controller TB3-C4 Controlling the Red Light SystemMaster Controller TB5-NO4 Responding to Top Red Beacon Failures9LCA Alarm Card NC1 9LCA Alarm Card C1Procedures for installation of conduit and tower wiring Flex Conduit Typical Installation LayoutAirport Systems Airport Systems Flex Conduit Installation Junction Box Wiring Details Flex Conduit Installation Detail WC000001 Cable Overview Splicing Details for WC000001 CableAirport Systems Airport Systems 10 Flashhead Cable 10 Master Controller Circuit Board 11 Flashhead Digital Control Board Final Installation Check Power Up and System Tests If SW2-2 is set for no External RED system OFF then If SW2-2 is set for an External RED system ON, thenDay Mode Night Mode Twilight ModeAirport Systems Airport Systems Airport Systems SGF-60 Flashhead Overall DescriptionAirport Systems Airport Systems Communications Power SuppliesMode Selection Flash Feedback Flash ControlFlashtube Triggering High Voltage RectificationSGC-60 Master Controller Airport Systems Airport Systems Master Controller Board Schematic SGF-60 Flashhead System Schematic SGF-60 Digital Board Schematic SGF-60 Trigger/High-Voltage Board Schematic Troubleshooting RLC General Troubleshooting All Flashheads Stuck in Day Mode General Troubleshooting Flashhead Does Not Flash General Troubleshooting Flashhead Stuck in Day Mode Dual System-Specific Troubleshooting Catenary System-Specific Troubleshooting Chart SGC-60 Replacement Transformer White wire to the outer bottom right terminal Flashtube Installation Ambient Light Sensor Photocell Description Part Number Replacement PartsSG-60 AOL Power Supply Component Location SG-60 AOL Flashhead Mounting Dimensions SG-60 AOL Power Supply Mounting Dimensions SG-60 AOL Wiring Installation SG-60 AOL Flashhead Component Locations SG-60 AOL Power Supply Component Locations SG-60 AOL Schematic