Saeco Coffee Makers SUP 025 PYR manual Legal Information, Scrapping, Programming the rinsing cycle

Page 16

ENGLISH

Before proceeding, you must check the water hardness of your area using the strip supplied with the appliance. Quickly immerse (1 second) the strip into the water and shake slightly. After a mi-

nute, the strip shows the test results.

To program this function, proceed as follows:

Press the button (22); the number of lit buttons indicates the programmed water hardness;

If you desire to change the water hardness level, press the button (22) repeatedly until the correct number of lit buttons are displayed, indicating the water hardness level.

If in doubt, program to a higher water hardness.

Hardness 1 = buttons (22) and (23) lit Hardness 2 = buttons (22), (23) and (24) lit Hardness 3 = buttons (22), (23), (24) and (25) lit Hardness 4 = buttons (22), (23), (24), (25) and (26) lit

The hardness index matches the 1-4 squares on the strip.

1 = softest and 4 = hardest water setting.

12.2 Programming the rinsing cycle

When first switched ON, the machine will carry out an automatic rinsing cycle. Approx. 3-4 oz of water are dispensed through the system and out through the coffee dispenser to ensure you get fresh water for your first cup of coffee.

To program this function, proceed as follows:

Press the button (23); when the function is ON, the warning light (27) lights up.

12.3 Programming Prebrewing

The prebrewing process slightly dampens the coffee before brewing to improve the extraction; this brings out the full aroma of the coffee and gives it an excellent taste.

To program this function, proceed as follows:

Press the button (24); when the function is ON, the warning light (28) lights up.

Note: the manufacturer has already activated this function.

12.4 Programming Pregrinding

The pregrinding procedure makes the machine grind twice: the first time, for the cup of coffee just selected, and then, for the next cup of coffee (not yet selected). This function is only useful when preparing numerous cups of coffee in rapid succession (for example, during a dinner party) as you always have a dose of ground coffee ready to go inside of the machine.

To program this function, proceed as follows:

Press the button (25); when the function is ON, the warning light (29) lights up.

13 LEGAL INFORMATION

This instruction book contains the necessary information to use and upkeep your appliance correctly.

The information should be viewed as a guideline to use and upkeep your coffee maker in safety. The information is not exhaustive. For additional information or for information on topics not covered or inadequately covered in this book, please contact the authorized service centers or the manufacturer directly.

In addition, we should mention that these instructions are not a part of a previous or existing agreement, legal contract or similar and that the information is not changed by any other document.

All the manufacturer’s obligations and liabilities are based on the relative sale contract that also specifies all warranty terms and conditions.

The contractual warranty terms and conditions are not limited or extended based on this instruction book.

This instruction book contains information protected by copyright.

This instruction book cannot be photocopied or translated into other languages without the explicit written consent of the manufacturer.

14 SCRAPPING

Make unusable any appliances not in use.

Detach the plug from the wall outlet and cut the electric cord.

Deliver broken appliances to a suitable collection center.

• 16 •

Image 16
Contents For Household USE only Page Page Page Page Important Safeguards EnglishUsing this instruction book GeneralitiesTechnical Information Reading this instruction bookSizes in millimeter Safety Standards Repairing / Maintenance Description of PartsFire Fighting Control panelInstalling the Coffee Maker PackagingPreliminaries Preparing the coffee maker for useAdjusting the Coffee Dose Coffee DispenserMaking coffee with coffee beans TankAdjusting the quantity of coffee per cup Dispensing HOT WaterDispensing Steam / Preparing Cappuccino Making coffee with preground coffeeCleaning and MAINTE- Nance Making coffee after using the steam functionGeneral Cleaning Brew unitDescaling Function ProgrammingProgramming water hardness FlashesLegal Information ScrappingProgramming the rinsing cycle Programming PrebrewingControl Panel Leds English RED Warning Light 27, Fixed RED Warning Light 28, FixedRED Warning Light 28, Flashing RED Warning Light 29, FixedTroubleshooting Problem Cause TroubleshootingLe nettoyage ou de les mettre en place FrançaisLui-même dans l’eau ou tout autre liquide Faire très attention en utilisant la vapeurUtilisation du mode d’emploi GénéralitésDonnées Techniques Pour faciliter la lectureMesures en millimètres Normes DE Sécurité Tableau de commande Description DES ComposantsRangement de la machine Réparations / EntretienInstallation EmballageOpérations préliminaires Première utilisationMoulin À Café Réglage DE LA Dose DE CaféDistribution DU Café 23 et 24 restent allumés de manière fixeDistribution avec du café moulu Distribution avec du café en grainsRéglage de la quantité de café par tasse Distribution D’EAU Chaude Distribution DE Vapeur / Préparation DU CAPPUCCI- noNettoyage ET Entretien Passage de la vapeur au caféDetartrage Groupe caféLaver le tout avec de l’eau chaude Dirigez le bec à vapeur 14 sur la cuvette d’égouttoirProgrammation DES Fonctions DE LA Machine Programmation «dureté de l’eau»Repartira si vous la rallumez Suivant les instructions suivantesInformations a Caractere Juridique DestructionProgrammation du «cycle de rinçage» Programmation de la «pré- infusion»Voyants DU Tableau DE Commande Français Lumière Rouge 26 Fixe Voyant Rouge 27 FixeVoyant Rouge 27 Clignotant Voyant Rouge 28 FixeANOMALIES, Causes ET Remèdes Problèmes Causes RemèdesFrançais Importantes EspañolGeneralidades Datos TécnicosPara facilitar la lectura Utilización de estas instrucciones de usoMedidas en milímetros Normas DE Seguridad Descripción DE LOS COMPO- Nentes Guardar la máquinaReparaciones / Mantenimiento AntiincendioInstalación EmbalajeOperaciones preliminares Primer encendidoRegulación Dosis DE Café Moledor DE CaféErogación DE Café Erogación con café en grano Erogación con café molidoRegulación de la cantidad de café por taza Sucesivamente se pone en marcha el ciclo de erogaciónLimpieza Y Mantenimiento Erogación DE Agua CalientePaso de vapor a café Grupo erogador DescalcificaciónCerrar la puertecilla Programación DE LAS Funciones DE LA Máquina Programación dureza del aguaInformaciones DE CARÁC- TER Jurídico SupresiónProgramación del ciclo de aclarado Programación de la preinfusiónTestigos Luminosos DEL Panel DE Mandos Español LUZ Roja 26 Fija LED Rojo 27 FijoLED Rojo 27 Parpadeante LED Rojo 28 FijoProblemas Causas Remedios ANOMALÍAS, Causas Y RemediosEspañol COD .6.589.59.00 REV DEL 15/06/02