Protect PV.630 Maintenance and Servicing

4 Maintenance and Repair

4.1General Information

The installed AEG Power Solutions system contains high-quality, durable parts and components, which are coordinated with one another in order to provide the best possible conditions for system operation. To maintain the functional reliability of the system and to make sure it continues to deliver optimum energy yields, the fol- lowing steps need to be performed on a regular basis:

Regular inspection of system operation

Annual system maintenance

Servicing according to the duration of operation

Observe the applicable country-specific standards and direc- tives.

i

The operator or their designated representative is respon- sible for the system whilst maintenance work is being car- ried out; he or she also coordinates the work itself.

The person appointed to maintain the system is responsi- ble for the work carried out on the system section as- signed to him or her.

DANGER

Contact with voltage! Extremely high DC voltages of up to 1000 VDC are present.

Risk to life due to electric shock.

Do not touch live parts.

Wear personal protective equipment.

4.2Scope of the Recommended Measures

We recommend carrying out the following work:

Task￿

Interval

 

 

Inspection

1 - 3 months, depending on installation site

 

 

Function test

6 months

 

 

Maintenance

12 months

 

 

Servicing

According to number of operating hours worked

 

 

80000047962 BAL

5 of 14

Page 102
Image 102
AEG PV.630 manual Maintenance and Repair, Scope of the Recommended Measures