Protect PV.630 Installation and Start-up

Auxiliary power supply via external circuit 2 (E1:L/N/PE;AC230V); F60.

2 right bridge block:

Auxiliary power supply via internally generated circuit 1; F61. (As delivered)

i

The bridge block must not be disconnected in "Operation" status.

The inverter cannot be switched on without a bridge block.

F60, F61 switched off (DC/AC control cabinet).

F14 switched off (DC/AC control cabinet).

Q4.1 switched off (DC/AC control cabinet).

Q26 switched off (external).

F41 not engaged (DC/AC control cabinet).

F22, F13, F101 switched on (DC/AC control cabinet).

iThe low-voltage winding of the mains transformer must not be connected to earth.

6.2Connection of AC Voltage

iAn insulation test must be performed before the mains voltage is connected.

Connect the medium-voltage switchgear. Voltage is present at the external mains isolating point.

Medium voltage:

DANGER

Switchgear not connected correctly!

Risk to life due to electric shock.

Only qualified and trained skilled personnel who are authorised to work with switchgear and have experience of doing so may connect the switchgear.

Wear personal protective equipment.

Skilled personnel are appointed by the system operator.

18 of 21

80000047963 BAL

Page 94
Image 94
AEG PV.630 manual Connection of AC Voltage, Right bridge block, Medium voltage Switchgear not connected correctly