Protect PV.630 Installation and Start-up

6.1Start-up Preparations

The following are required:

3-pin phase-rotation indicator

Multimeter

Two-pin voltage detector

Circuit diagram

Prerequisites:

All miniature circuit breakers are switched on.

All circuit breakers and load interrupters are switched off.

Protect PV.

 

 

+DCD/ACD

 

Modul)

+INV

-K7

 

-Q4.1

-A1

 

-F41

-L26

 

DC (PV-

 

Control

 

 

 

-F13,

 

 

 

 

 

 

-F22,

 

-F38,

 

-F60,

 

-F81

Com

-F61,

 

 

 

-F101

+NSHV

-Q26 -Q1

2

1

EVU-Netz Mains

Figure 7 - Functional principle, with miniature circuit breakers shown

i

Isolating points Q1 and Q26 are designed on a system- specific basis and do not form part of the PV.630.

Before connecting the AC voltage, check:

Auxiliary power supply circuit selection circuit 1/circuit 2

Select the auxiliary power supply circuit by positioning the bridge block on terminal X14.

X14

1 2 3 4 5 6 7

8 9

1 1 1

0 1 2

X14

1

2

3

4

5

6

7

8

9

1

1

1

 

 

 

 

 

 

 

 

 

 

0

1

2

1

2

Figure 8 – Auxiliary power supply circuit selection 1 left bridge block:

80000047963 BAL

17 of 21

Page 93
Image 93
AEG PV.630 manual Start-up Preparations, Prerequisites, Before connecting the AC voltage, check