Protect PV.630 Installation and Start-up

Table of Contents

1

General Information

4

2

Safety

4

3

Product Details

4

4

Transport, Storage and Installation

5

4.1

Packaging

5

4.2

Storage

5

4.3

Installation Site Requirements, Operating Area

5

4.4

Using a Crane to Transport and Install the System

7

4.5

Using a Forklift or Lowlift Truck to Transport the System

9

4.6Installation and Assembly in the Event of Control Cabinets

 

Being Supplied Separately

11

4.7

Installing, Aligning, Attaching

11

4.8

Tightening Torque Values for Screw Connections

12

5

Connection Work

13

5.1

External Connections

14

5.2Internal Connections in the Event of Control Cabinets Being

 

Supplied Separately

15

6

Start-up

16

6.1

Start-up Preparations

17

6.2

Connection of AC Voltage

18

6.3

Connection of DC Voltage

20

7

Isolating Solar Inverters

21

7.1

Isolation Procedure

21

80000047963 BAL

3 of 21

Page 79
Image 79
AEG PV.630 manual Connection Work, Start-up, Isolating Solar Inverters