Protect PV.630
Page
Page
Page
Protect PV.630
Operating instructions
AEG Power Solutions GmbH
Table of Contents
Monitoring Systems, Messages and Faults
System Function
Interfaces
Graphical Display and Operation Unit
General Information
Information on How to Use these Instructions
Warranty
Validity
Obligations of the Equipment Operator
Target Groups
Explanations of Target Groups
Handling
Skilled Personnel Skills and Trainings
Storing Instructions
Obligations of skilled personnel
Symbol Meaning
Explanation of Symbols and Safety Instructions
Explanation of Symbols
Hazard Symbols Used
Safety Instructions
Signal Words Used
Symbol Meaning for skilled personnel
Signs Containing Orders for Personal Protective Equipment
Abbreviations
Emergency Procedure e.g. in the Event of a Fire
Safety Awareness
Thin-film cells
Particular Dangers associated with Photovoltaic Systems
Crystalline silicon cells
Lightning protection
System stop switch
Safety Signs and Warning Notices on the Equipment
Safety and Protection Devices for the Equipment
Protective Covers
Residual Hazards
Lockable Equipment Doors
Guard
Electrical Hazards
Water in electrical equipment
Risks Due to Moving Parts
Fire-Related Risks
Risk of injury due to rotating fans
Risks from Maintenance and Repair Work
Risks due to Loss of Control
Important information about equipment documenta- tion
Product Details
Product Description
Appropriate Use
Dimensions and Views
Safety
Nameplate
Inappropriate Use
Standards, Directives and CE Mark
Technology
Operating Elements
Individual Operation
System Description
Operating Modes
Partner Operation
OFF Status
System Function
Description of Sequence Control
Waiting for Feed Conditions Status
Operation Status
Waiting Status
Sequence Control During the Course of the Day
Fault Status
Night Status
Early morning
Later in the evening
Day
Evening
Night
Power limit value for shutdown, delay time for shutdown
Inverter stack switch-on time
Permissible voltage dip after switching on the stack
Sequence Control Parameters
Description of Fan Control General
Fan Control, Cabinet Fan
Cabinet Fan Control Parameters
Fan Control, Inverter Stack Fan
Parameters of Inverter Stack Fan Control
Igbt temperature limit value for switching off the fan
Igbt temperature limit
Insulation Monitoring and Earthing of PV Cells General
General
Maintenance mode
Operation with Thin-Film Solar Cells
Sequence control
Insulation Monitoring in Partner Operation
Insulation Monitoring Parameters
MPP Tracker
Linked Operation
Change of status to linked operation
Single Operation
Change of status to separate operation
Linked Operation in the Event of a Fault
Partner Operation During the Course of the Day
Partner Operation Parameters
Extended operating mode
Load threshold for connecting the INV
Later that morning
Power rating for normal feed-in capacity
Monitoring Systems, Messages and Faults
Parameters of the Extended operating mode
Power rating for increased feed-in capacity
Protect PV.630 Operating Instructions
Table of Faults
Temperature monitoring systems
Can I/O monitoring systems Fault/Message
Unit Monitoring Systems Fault/Message
DC voltage monitoring systems Fault/Message
Interfaces
Communication Interface
Communication data port 2
Technical Data MultiCom CCC hardware data assembly A29.1
Communication data port 1
Communication data port 3
Connections
Configuration jumpers
Structure of the MultiCom CCC Interface
Button
Description of serial interfaces
Port 2 X5 RS485 pin assignment default
Shield connection of the RS485 bus line
Port 3 X4 can pin assignment
Port 2 X5 RS232 pin assignment
Controller Area Network can at
Setting the terminal program
Configuration
Configuration Preparations
Carriage return or Enter key
Configuring the Modbus Protocol
Data protocol configuration
Configuring Modbus Data Transmission
Modbus/JBus data transmission configuration
Structure of the COM Server
COM Server General
Network Connection
Installation of the COM Server
Network Integration Configuration
Configuration of the Virtual COM Port
Structure
Remote Signalling
Technical data
Following default signals are used for remote signalling
Graphical Display and Operation Unit
DOU
Keyboard Operation
Signalling
Acoustic signal generator
LEDs
Possible symbol keys and their function
Start-up
Menu Structure Menu Tree
Main Menu
Operating Display
Operating display Normal operation
Examples of possible displays
Example of operating display
Solar radiation is too low, the inverter is in standby mode
Monthly data t = day 1 31 for the last 12 months
Example of yearly overview
Menu
Status/Measured Values
Blocking
Menu Inverter
Service
Fault History
Settings
Information
Installation and Start-up
80000047963 BAL
Isolating Solar Inverters
Connection Work
Start-up
Safety
General Information
Packaging
Transport, Storage and Installation
Installation Site Requirements, Operating Area
Storage
Air vents on the system 1=supply air, 2=exhaust air
Preparations
Using a Crane to Transport and Install the System
Risk of accident due to suspended loads
Transporting the Equipment
Preparation
Using a Forklift or Lowlift Truck to Transport the System
Risk of accident due to transport with industrial trucks
Transporting a system using industrial truck
Installing, Aligning, Attaching
Bottom attachment 80000047963 BAL
Tightening Torque Values for Screw Connections
Installation without control cabinet doors
Connection Work
External Connections
System not installed correctly
Power terminals
Control/Monitoring terminals
Cables are connected as follows
Start-up
Prerequisites
Before connecting the AC voltage, check
Start-up Preparations
Right bridge block
Medium voltage Switchgear not connected correctly
Connection of AC Voltage
Auxiliary power supply via external circuit
Other fault indications
After connecting the DC voltage
Field rotation fault fault message
Connection of DC Voltage
Isolation Procedure
Isolating Solar Inverters
Maintenance and Servicing
Protect PV.630 Maintenance and Servicing
Fault Messages
General Information
Maintenance and Repair
Scope of the Recommended Measures
Inspection
Visual Inspection
View of cabinet without doors 80000047962 BAL
Removing Accumulated Dust
Diagnostic Functions
Reading Out the Memory
Obligation to Keep a Written Record
Functional Test
Isolating Solar Inverters
Checking the Monitoring System
Cleaning and Checking the Protection Devices
Maintenance
System Stop
Additional Work
Repair
Removing the fan
Removing and Installing the Fans
Installing the fan
Power Section
Component
Fault Messages
Spare Parts and Customer Service
Page
Protect PV.630
Page
CEA
Page
X3UVWPE
Page
1000003063
Page
Peinv
Page
F83
Page
A29.1 A27 A20
Page
1000003063 en