AEG PV.630 manual Transport, Storage and Installation, Packaging

Models: PV.630

1 128
Download 128 pages 35.18 Kb
Page 81
Image 81

Protect PV.630 Installation and Start-up

4 Transport, Storage and Installation

4.1Packaging

The system or the individual control cabinets are fastened to transport pallets and packed at the factory to withstand both rail and road transport. The system or the individual control cabinets are packed in plastic film to prevent any damage to the surface paint and to protect against moisture.

4.2Storage

Only store the system or the individual control cabinets for a max- imum period of six months in the original packaging in dry, venti- lated rooms with a permanent roof. The permissible ambient tem- perature range is between -35°C and +70°C with a relative humidi- ty of 85%.

If the system or the individual control cabinets are stored for longer than six months, they must first be packed with standard desic- cants and then sealed in airtight plastic film.

i

To prevent damage, only remove the protective film from the system or the individual control cabinets immediately prior to installation.

4.3Installation Site Requirements, Operating Area

The system is intended for installation in areas which are difficult to access.

The system is intended for operation in a station (container) by de- fault. The system must be installed in such a way that the supply air and exhaust air ducts can ensure sufficient cooling of the INV control cabinet. Access must facilitate replacement of the fans and opening of the cleaning flap.

If the system is not operated in a wall-mounted station, additional measures must be taken to ensure that there is sufficient cooling of the INV control cabinet in particular and that the exhaust air cannot get back in through the supply air openings.

Suitable floor surfaces for installation of the system are:

Double floors

Above cable ducts or

Directly on a level surface

Ensure that the weight of the system does not exceed the max- imum floor bearing capacity.

Observe the applicable fire protection requirements.

80000047963 BAL

5 of 21

Page 81
Image 81
AEG PV.630 manual Transport, Storage and Installation, Packaging, Installation Site Requirements, Operating Area