Protect PV.630 Maintenance and Servicing

4.4.2Cleaning and Checking the Protection Devices

Clean or replace the filter mats.

Clean the heat sink in the solar inverter power section.

Check the clamping joints for thermal stress and ensure they are secure.

Check the fuses and isolators.

4.4.3Checking the Monitoring System

Check insulation monitors.

Check Q26 triggering.

Test the function of the anti-condensation heater (option).

Inverter start-up

Solar inverter start-up – see start-up information for the Protect

PV.630.

Check the LEDs on the DOU.

Check that the solar inverter starts up correctly.

4.4.4System Stop

Test the function of the installed system shutdown equipment.

Test the internal system stop switch (DC/AC control cabinet).

4.4.5Documentation

The functional test procedure followed and the results obtained must be recorded.

4.5Maintenance

The measures described under points 4.3 and 4.4 form part of the maintenance activities.