Switched Rack PDU

USER’S GUIDE

®

Scheduling Outlet Actions (Web Interface Only)

Actions you can schedule

For any outlets you select, you can schedule any of the following actions to occur daily; at intervals of one, two, four, or eight weeks; or only once.

To configure values for Power On Delay, Power Off Delay, and Reboot Duration for each outlet, see How to configure outlet settings and outlet name. Although you must use the Web interface to schedule outlet actions, you can set these values in either the Web or control console interfaces.

For an action to be applied to an outlet group, you must have outlet groups enabled at the beginning of the scheduled action. For example, if Off Delayed is scheduled for 4:00 p.m., the Power Off Delay begins at 4:00 p.m. Even if you then enable outlet groups during that Power Off Delay before any of the outlets are scheduled to turn off, the action will be applied only to the individual outlet and not the outlet group.

Option

Description

 

 

No Action

Do nothing.

 

 

On Immediate

Apply power to the selected outlets.

 

 

On Delayed

Apply power to each selected outlet according to its value for Power

 

On Delay.

Off Immediate

Remove power from the selected outlets.

 

 

If an outlet group is selected, the configured delays and reboot duration of the lowest- numbered outlet (for a local outlet group) or of the global outlet (for a global outlet group that is initiating the action).