A

AC power installation 3-18access rights 4-32Access Router

configuration overview 5-33, 6-47, 7-53Configuring Packet Processing Mode 6-52, 7-54Configuring Static Routes 7-55

Configuring the Firewall 6-52, 8-63Setting ID, Date, and Network Timing 5-35

AIS

network AIS received alarm 16-129alarms

configuring 11-85display 11-85Menu 8 11-86SNMP mode 11-85

assigning passwords 4-32attaching to a terminal

COMM 4-26standalone 4-26

C

carrier loss

network carrier loss alarm 16-128COMM PORT 16-130

COMM port

attaching to terminal 4-26command line help 17-138configuring

alarm conditions 11-85Controlled Slip Seconds See CSS CRC Errors 16-131

CSS 10-78

Current Interval Time 10-78Current Test 16-130

D data

performance data compliance 10-75Data Carrier Detect (DCD) 16-130delay monitoring 10-79diagnostics 9-65

from terminal screen menus 9-70Link Layer 9-71

Loop Down Remote 9-67Loop Payload test 9-67Loop Up Remote 9-67loopback tests 9-66materials required 9-65Menu-9 9-70

physical layer 9-70self test 9-65

Dial Out Time Interval 16-129dial-out capability

Index

telephone numbers 16-129

DLC IBC (E1 platform) Link Loss Alarm 16-129download utility 15-103

downloading software abnormal termination 15-104download utility 15-103error indicators 15-104setting up TFTP 15-103user aborted 15-105Xmodem setup 15-103

E

EFS events

Payload Loopback Actuated 10-78

EFS Field, calculating EFS 4-23

Errored Seconds See ES

ES

Event Log 10-78

F

front panel tests 9-65

G

Grounding 3-19

H

Hyperterm 4-27

I

in-band

network registers

24 hour detail 10-81In-band CRC Error Threshold 16-130In-band Link Loss Alarm 16-129in-band management 10-80installation

AC power 3-18

mounting the unit on a tray 3-18tray cable requirements 3-19

installing

attaching to terminal 4-26

K

KERNEL Commands 17-152

L

lamp test 9-69LEDs

lamp test 9-69

Link Layer diagnostics 9-71, 9-72link-based testing

public packet networks 9-72

203

Page 215
Image 215
Black Box LRU4240 manual Index, Data