40
PRO SWITCHING SYSTEM
5. Installation
This chapter shows you how to install a Pro Switching System for SNMP
management.

5.1 Preparing the Rack

“Preparing the rack off-site” sets up the rack so that a technician can quickly install
the rack on-site, leave, and let the network manager perform the necessary
SNMP/Telnet configurations to the rack remotely.
To prepare the rack:
Fill Out the Rack Description Guide (Section 5.1.1)
Configure the Control Card (Section 5.1.2)
Install Components (Section 5.1.3)
Enter IP address into rack (Section 5.1.4)
5.1.1 F
ILL
O
UTTHE
R
ACK
D
ESCRIPTION
G
UIDE
1. Make the appropriate number of photocopies of the Rack Description Guide
sheet (shown in Appendix A) for the number of racks to be installed.
2. Complete the information on the sheets for each rack. (See the “Rack
Description Guide Example” on the next page.)
3. Make two photocopies of the completed sheets.
4. Give one set of sheets to the installation technician. Give another set to the
network manager. Store the original sheets in a master file.