Introduction
Overview of the SCE 2000 Platform
Installation and Maintenance
Connecting the Management Interfaces and Performing Initial System
Configuration
Basic SCE 2000 Platform Operations
Cabling the Line Ports and Completing the Installation
Troubleshooting
The External Optical Bypass Module A-1
Index
Audience
Preface
Installation and
Organization
Maintenance on page
Connecting the
Obtaining Documentation on page
Related Publications
boldface font
Document Conventions
italic font
boldface screen font
Obtaining Technical Assistance
Obtaining Documentation
Cisco.com
Documentation Feedback
Submitting a Service Request
Definitions of Service Request Severity
Obtaining Additional Publications and Information
SCE 2000 4xGBE Installation and Configuration Guide
Preface Obtaining Additional Publications and Information
OL-7824-02
Page
Introduction
C H A P T E R
SCE Platform Management Interfaces
SCE Platform Management Interfaces
Chapter
SCE Platform Management Interfaces
Service Control and the SCE Platform
Service Control and the SCE Platform
Checking the Shipping Container Contents
SCE 2000 Installation Checklist
Model number
Service Control Management
SCE 2020 4xGBE
Link Type
SCE 2000 4xGBE Installation and Configuration Guide
Front Panel
Chapter 2 Overview of the SCE 2000 Platform Front Panel
Figure 2-2 SE2000 Front Panel
Quantity
Port
Description
Connect This Port To…
Description
LED Groups
Back Panel
SCE 2000 Component List
Checking the Shipping Container Contents
SCE 2000 Installation Checklist
Task
SCE 2000 Installation Checklist
Verified
Date
Page
The SCE 2000 Platform
Topology
Topology Considerations
The SCE 2000 Platform Topology Considerations
Functionality
Number of links
Redundancy
Bypass Mechanism
Link Continuity
Physical Topologies
Single SCE 2000 Topologies
Single Link Receive-only Topology
Single Link Inline Topology
Dual link Inline Installation
Figure 3-2 Single SCE Platform Single Link In-line Topology
Figure 3-3 Single SCE Platform Dual Link Inline Topology
Dual Link Receive-Only Topology
Two Cascaded SCE 2000s For Dual Links
Two Cascaded SCE 2000s Inline Topology
Topology-Related Parameters
SCE 2000 Configuration
Connection Mode Parameter
Inline/Receive-only
Physically Connected Links Parameter
Priority
On-Failure Mode Parameter
Page
Preparing to Install the SCE 2000 Platform
Installation and Maintenance
Preparing to Install the SCE 2000 Platform
Installing the SCE 2000 Platform
Tools and Parts Required
Airflow
Site Requirement Guidelines
Site Requirements
Installing the SCE 2000 Platform
Installation Precautions on page
Installation Precautions
Installing the SCE 2000 on a Workbench or Tabletop on page
Attaching a Chassis Ground Connection on page
Installing the SCE 2000 on a Workbench or Tabletop
Mounting Brackets for 2-post Rack Mounting Brackets for 4-post Rack
Rack-Mounting a SCE 2000 Platform
Attaching the Brackets to the SCE
Step 3 Repeat steps 1 and 2 on the other side of the SCE
Attaching the Crossrail Supports to the Rack
Figure 4-6 Assembling the Slider Brackets
Mounting the System to the Rack
Installing the SCE 2000 Platform
Chapter 4 Installation and Maintenance
SCE 2000 4xGBE Installation and Configuration Guide
Figure 4-8 Sliding the SCE 2000 into the Rack
Figure 4-9 Securing the SCE 2000 to the Rack
Attaching a Chassis Ground Connection
Figure 4-10 Grounding the Unit AC
Installing the SCE 2000 Platform
Chapter 4 Installation and Maintenance
SCE 2000 4xGBE Installation and Configuration Guide
Figure 4-11 Grounding the Unit DC
Power Supply Overview
LEDs
Power Supply Unit Condition
Power Supply Specifications
Power Supply Unit Condiiton
LED State
Powering Down the Power Supply Unit and Disconnecting Input Power
Removing and Replacing a Power Supply Unit
Removing the Power Supply Unit on page
Replacing the Power Supply Unit on page
Powering Down an AC-Input Power Supply
Replacing the Power Supply Unit
Removing the Power Supply Unit
Reconnecting AC-Input Power Supply Unit
Reconnecting the Power
Reconnecting AC-Input Power Supply Unit on page
Reconnecting DC-Input Power Supply Unit on page
Reconnecting DC-Input Power Supply Unit
Step 6 Turn the on/off switch to the on position
Fan Module Overview
Removing and Replacing the Fan Module
Removing the Fan Module on page Replacing the Fan Module on page
Replacing the Fan Module
Removing the Fan Module
Figure 4-17 Inserting the Fan Module
Replacing the Battery
Connecting the Local Console
Performing Initial System Configuration
Connecting the Local Console
Initial System Configuration
Setting Up the Local Console
Initial System Configuration
admin password
Following are some general instructions regarding the setup dialog
appear “Sorry, Skipping is not allowed at this stage.”
Step 1 Configuring Initial Settings
Step 3 Setting the Passwords
Step 2 Configuring the Hostname
Enter IP address of default gateway
Enter IP address Enter IP subnet mask255.255.0.0
Step 4 Configuring Time Settings
Note Passwords are case sensitive
Note The default password for all levels is “cisco”
To configure the time settings, complete the following steps
Enter
Step 5 Configuring the DNS Settings
Step 3 Type the default domain name to be used, and press Enter
Step 6 Configuring the RDR Formatter Destination
Entry Formats
Step 7 ConfiguringAccess Control Lists ACLs
permit any deny
Order of Entries
deny 10.1.1.0 permit any
Enter
Step 7 The maximum number of entries in an ACL is
We want to restrict Telnet access to only a few permitted stations
Would you like to enter the SNMP configuration menu? no y
Step 8 Configuring SNMP
Enable SNMP management? no y
Enter SNMP GET community name
Step 8 The maximum number of SET communities is
To disable the Authentication Failure trap, press Enter
Step 9 Configuring the Topology-Dependent Parameters
Secondary
To specify Primary, press Enter
EXAMPLE #3
EXAMPLE #2
Step 10 Completing and Saving the Configuration
Step 6 The system informs you that the configuration is complete
Connecting the Management Interface
Cabling the Management Port on page
Verifying Management Interface Connectivity on page
Cabling the Management Port
Verifying Management Interface Connectivity
C\ping 10.1.1.201 pinging PING 10.1.1.201 56 data bytes
Page
Connecting the line ports to the network
Cabling the Line Ports and Completing the Installation
Connecting the line ports to the network
Installing a Cascaded System
Single Link Inline Topology on page
Cabling Diagrams
Single Link Receive-only Topology on page
Dual Link Single SCE 2000 Topologies on page
Single Link Receive-only Topology
Dual Link Single SCE 2000 Topologies
Figure 6-4 Cabling Diagram Dual Link One SCE 2000 Receive-only
Figure 6-3 Cabling Diagram Dual Link One SCE 2000 Inline
Dual Link Two SCE 2000s Topology
SCE 2000 #1
SCE 2000 #2
Inline topologies require connecting both Receive and Transmit fibers to the SCE 2000. Cascade ports always require both Receive and Transmit fibers to be connected
Configuring the GBE Interface Parameters
Configuring GigabitEthernet Auto-Negotiation
Step 3 Type auto-negotiate and press Enter
Connecting the GBE Line Interface Ports
Fiber Specifications
Cabling the GBE Port
Figure 6-6 Cabling the GBE Interface
Step 2 Verify that the link LED is green
Examining the LEDs
Testing Connectivity Examining Link LEDs and Counters
Viewing the Counters to Verify that the Network Traffic is
Reaching the Device
The following example displays a system response
Installing a Cascaded System
CLI Commands
Configuring the Connection Mode
Topology-Related Parameters for Redundant Topologies
Link Mode
links forwardingbypasssniffingcutoff and press Enter
Monitoring the System
Loading and Activating a Service Control Application
Service Control Application Suite for Broadband User Guide
Service Control Application Suite for Broadband Reference Guide
Performing Complex Configurations
Managing SCE 2000 Configurations
Rebooting and Shutting Down the SCE Platform
Basic SCE 2000 Platform Operations
Starting the System and Observing Initial Conditions
Verifying Operational Status
Final Tests
Viewing the User Log Counters
Verifying Operational Status on page
Viewing Configuration
Managing SCE 2000 Configurations
Viewing Configuration on page
Saving the Configuration Settings on page
To view the running configuration, complete the following steps
Step 1 At the SCE 2000# prompt, type show version
Step 3 Type copy running-config startup-config
Saving the Configuration Settings
The following example shows the running configuration file
copy tffs0system/prevconf/config.tx1 tffs0system/config.txt
Recovering a Previous Configuration
Performing Complex Configurations
Cisco Service Control Engine SCE Software Configuration Guide
Cisco Service Control Engine SCE CLI Command Reference
Rebooting the SCE Platform
Rebooting and Shutting Down the SCE Platform
Step 2 Type reload shutdown
Shutting Down the SCE Platform
Troubleshooting Overview
Troubleshooting
Troubleshooting Overview Problem Solving Using a Subsystems Approach
C H A P T E R
CLI Commands for Troubleshooting
Troubleshooting Tools
CLI Commands for Troubleshooting on page The User Log on page
Troubleshooting firmware package installation
Troubleshooting the link interface subsystem
Troubleshooting the management subsystem
The Logging System
The User Log
Copying the User Log
ftp//usernamepassword@ipaddress/path and press Enter
Viewing the User Log
Step 1 From the SCE 2000# prompt, type logger get user-log file-name
Viewing the User Log Counters
Clearing the User Log
The system asks Are you sure?
Type Y and press Enter
Generating a File for Technical Support
Check the LEDs
Front Panel on page
SCE 2000 Operational Status on page
Booting
SCE 2000 Operational Status
Initial state after reset
Boot is completed
Problem Solving Using a Subsystems Approach
Identifying Startup Problems
Troubleshooting the Power Subsystem
Possible Solution
Symptom
Possible Cause
LED Label
Diagnostic Action
Troubleshooting the Firmware Package Installation
configure Boot system filename
Symptom
Symptom
Troubleshooting the Management Subsystem
Diagnostic Action
Possible Solution
Refer to IP Configuration in
See Initial System Configuration
Software Configuration Guide
See Initial System Configuration
Troubleshooting the Link Interface Subsystem
Configuring the GBE
Configuring the GBE
Check auto-negotiation
show interface
Page
A P P E N D I X A
The External Optical Bypass Module
Figure A-1 External Optical Bypass Module Inactive not in bypass
External Optical Bypass Functionality
Figure A-2 External Optical Bypass Module Active in bypass
The External Optical Bypass Module Front Panel
Installing the Module in a Rack
Installing the External Bypass Module
Cabling the External Optical Bypass Module
To cable the External Optical Bypass module
Step 6 Connect the control cable supplied in the kit from the Bypass 9-pin D-Type connector on the rear panel of the SCE 2000 platform to the Control connector on the External Optical Bypass module
Value
Specifications
Function
Pin D-type side
Page
Index
Page