Corporate Headquarters
SCE 2000 4xGBE Installation and Configuration Guide
Version OL-7824-02
Cisco Systems, Inc 170 West Tasman Drive San Jose, CA USA
SCE 2000 4xGBE Installation and Configuration Guide
Turn the television or radio antenna until the interference stops
Introduction
C O N T E N T S
Preface
Overview of the SCE 2000 Platform
Configuration
Installation and Maintenance
Connecting the Management Interfaces and Performing Initial System
Cabling the Line Ports and Completing the Installation
Basic SCE 2000 Platform Operations
Index
Troubleshooting
The External Optical Bypass Module A-1
Preface
Audience
Maintenance on page
Organization
Installation and
Connecting the
Related Publications
Obtaining Documentation on page
italic font
Document Conventions
boldface font
boldface screen font
Cisco.com
Obtaining Documentation
Obtaining Technical Assistance
Documentation Feedback
Obtaining Additional Publications and Information
Submitting a Service Request
Definitions of Service Request Severity
OL-7824-02
SCE 2000 4xGBE Installation and Configuration Guide
Preface Obtaining Additional Publications and Information
Page
SCE Platform Management Interfaces
Introduction
C H A P T E R
SCE Platform Management Interfaces
SCE Platform Management Interfaces
Chapter
Checking the Shipping Container Contents
Service Control and the SCE Platform
Service Control and the SCE Platform
SCE 2000 Installation Checklist
SCE 2020 4xGBE
Service Control Management
Model number
Link Type
Chapter 2 Overview of the SCE 2000 Platform Front Panel
Front Panel
SCE 2000 4xGBE Installation and Configuration Guide
Figure 2-2 SE2000 Front Panel
Description
Port
Quantity
Connect This Port To…
LED Groups
Description
Back Panel
Checking the Shipping Container Contents
SCE 2000 Component List
SCE 2000 Installation Checklist
Verified
SCE 2000 Installation Checklist
Task
Date
Page
Topology Considerations
Topology
The SCE 2000 Platform
The SCE 2000 Platform Topology Considerations
Redundancy
Functionality
Number of links
Link Continuity
Bypass Mechanism
Single Link Receive-only Topology
Physical Topologies
Single SCE 2000 Topologies
Figure 3-2 Single SCE Platform Single Link In-line Topology
Dual link Inline Installation
Single Link Inline Topology
Figure 3-3 Single SCE Platform Dual Link Inline Topology
Two Cascaded SCE 2000s For Dual Links
Dual Link Receive-Only Topology
Topology-Related Parameters
Two Cascaded SCE 2000s Inline Topology
Inline/Receive-only
SCE 2000 Configuration
Connection Mode Parameter
On-Failure Mode Parameter
Physically Connected Links Parameter
Priority
Page
Preparing to Install the SCE 2000 Platform
Installation and Maintenance
Preparing to Install the SCE 2000 Platform
Installing the SCE 2000 Platform
Tools and Parts Required
Site Requirement Guidelines
Airflow
Installing the SCE 2000 Platform
Site Requirements
Installing the SCE 2000 on a Workbench or Tabletop on page
Installation Precautions
Installation Precautions on page
Attaching a Chassis Ground Connection on page
Installing the SCE 2000 on a Workbench or Tabletop
Rack-Mounting a SCE 2000 Platform
Mounting Brackets for 2-post Rack Mounting Brackets for 4-post Rack
Attaching the Brackets to the SCE
Attaching the Crossrail Supports to the Rack
Step 3 Repeat steps 1 and 2 on the other side of the SCE
Figure 4-6 Assembling the Slider Brackets
Mounting the System to the Rack
SCE 2000 4xGBE Installation and Configuration Guide
Chapter 4 Installation and Maintenance
Installing the SCE 2000 Platform
Figure 4-8 Sliding the SCE 2000 into the Rack
Attaching a Chassis Ground Connection
Figure 4-9 Securing the SCE 2000 to the Rack
Figure 4-10 Grounding the Unit AC
SCE 2000 4xGBE Installation and Configuration Guide
Chapter 4 Installation and Maintenance
Installing the SCE 2000 Platform
Figure 4-11 Grounding the Unit DC
Power Supply Overview
LEDs
Power Supply Unit Condiiton
Power Supply Specifications
Power Supply Unit Condition
LED State
Removing the Power Supply Unit on page
Removing and Replacing a Power Supply Unit
Powering Down the Power Supply Unit and Disconnecting Input Power
Replacing the Power Supply Unit on page
Powering Down an AC-Input Power Supply
Removing the Power Supply Unit
Replacing the Power Supply Unit
Reconnecting AC-Input Power Supply Unit on page
Reconnecting the Power
Reconnecting AC-Input Power Supply Unit
Reconnecting DC-Input Power Supply Unit on page
Reconnecting DC-Input Power Supply Unit
Step 6 Turn the on/off switch to the on position
Removing the Fan Module on page Replacing the Fan Module on page
Fan Module Overview
Removing and Replacing the Fan Module
Removing the Fan Module
Replacing the Fan Module
Figure 4-17 Inserting the Fan Module
Replacing the Battery
Connecting the Local Console
Performing Initial System Configuration
Connecting the Local Console
Initial System Configuration
Setting Up the Local Console
Initial System Configuration
admin password
Following are some general instructions regarding the setup dialog
Step 1 Configuring Initial Settings
appear “Sorry, Skipping is not allowed at this stage.”
Enter IP address of default gateway
Step 2 Configuring the Hostname
Step 3 Setting the Passwords
Enter IP address Enter IP subnet mask255.255.0.0
Note The default password for all levels is “cisco”
Step 4 Configuring Time Settings
Note Passwords are case sensitive
To configure the time settings, complete the following steps
Step 5 Configuring the DNS Settings
Enter
Step 3 Type the default domain name to be used, and press Enter
Step 6 Configuring the RDR Formatter Destination
Step 7 ConfiguringAccess Control Lists ACLs
Entry Formats
deny 10.1.1.0 permit any
Order of Entries
permit any deny
Enter
Step 7 The maximum number of entries in an ACL is
We want to restrict Telnet access to only a few permitted stations
Enable SNMP management? no y
Step 8 Configuring SNMP
Would you like to enter the SNMP configuration menu? no y
Enter SNMP GET community name
Step 8 The maximum number of SET communities is
To disable the Authentication Failure trap, press Enter
Step 9 Configuring the Topology-Dependent Parameters
Secondary
To specify Primary, press Enter
EXAMPLE #2
EXAMPLE #3
Step 10 Completing and Saving the Configuration
Step 6 The system informs you that the configuration is complete
Verifying Management Interface Connectivity on page
Connecting the Management Interface
Cabling the Management Port on page
Cabling the Management Port
Verifying Management Interface Connectivity
C\ping 10.1.1.201 pinging PING 10.1.1.201 56 data bytes
Page
Connecting the line ports to the network
Cabling the Line Ports and Completing the Installation
Connecting the line ports to the network
Installing a Cascaded System
Single Link Receive-only Topology on page
Cabling Diagrams
Single Link Inline Topology on page
Dual Link Single SCE 2000 Topologies on page
Dual Link Single SCE 2000 Topologies
Single Link Receive-only Topology
Figure 6-3 Cabling Diagram Dual Link One SCE 2000 Inline
Figure 6-4 Cabling Diagram Dual Link One SCE 2000 Receive-only
SCE 2000 #2
Dual Link Two SCE 2000s Topology
SCE 2000 #1
Inline topologies require connecting both Receive and Transmit fibers to the SCE 2000. Cascade ports always require both Receive and Transmit fibers to be connected
Step 3 Type auto-negotiate and press Enter
Configuring the GBE Interface Parameters
Configuring GigabitEthernet Auto-Negotiation
Cabling the GBE Port
Connecting the GBE Line Interface Ports
Fiber Specifications
Step 2 Verify that the link LED is green
Figure 6-6 Cabling the GBE Interface
Viewing the Counters to Verify that the Network Traffic is
Testing Connectivity Examining Link LEDs and Counters
Examining the LEDs
Reaching the Device
The following example displays a system response
Installing a Cascaded System
Topology-Related Parameters for Redundant Topologies
CLI Commands
Configuring the Connection Mode
Link Mode
Monitoring the System
links forwardingbypasssniffingcutoff and press Enter
Service Control Application Suite for Broadband Reference Guide
Loading and Activating a Service Control Application
Service Control Application Suite for Broadband User Guide
Rebooting and Shutting Down the SCE Platform
Managing SCE 2000 Configurations
Performing Complex Configurations
Basic SCE 2000 Platform Operations
Starting the System and Observing Initial Conditions
Viewing the User Log Counters
Final Tests
Verifying Operational Status
Verifying Operational Status on page
Viewing Configuration on page
Managing SCE 2000 Configurations
Viewing Configuration
Saving the Configuration Settings on page
To view the running configuration, complete the following steps
Step 1 At the SCE 2000# prompt, type show version
Saving the Configuration Settings
Step 3 Type copy running-config startup-config
The following example shows the running configuration file
Recovering a Previous Configuration
copy tffs0system/prevconf/config.tx1 tffs0system/config.txt
Cisco Service Control Engine SCE CLI Command Reference
Performing Complex Configurations
Cisco Service Control Engine SCE Software Configuration Guide
Rebooting and Shutting Down the SCE Platform
Rebooting the SCE Platform
Shutting Down the SCE Platform
Step 2 Type reload shutdown
Troubleshooting Overview Problem Solving Using a Subsystems Approach
Troubleshooting
Troubleshooting Overview
C H A P T E R
CLI Commands for Troubleshooting on page The User Log on page
Troubleshooting Tools
CLI Commands for Troubleshooting
Troubleshooting firmware package installation
Troubleshooting the management subsystem
Troubleshooting the link interface subsystem
The User Log
The Logging System
Viewing the User Log
ftp//usernamepassword@ipaddress/path and press Enter
Copying the User Log
Step 1 From the SCE 2000# prompt, type logger get user-log file-name
The system asks Are you sure?
Clearing the User Log
Viewing the User Log Counters
Type Y and press Enter
Front Panel on page
Check the LEDs
Generating a File for Technical Support
SCE 2000 Operational Status on page
Initial state after reset
SCE 2000 Operational Status
Booting
Boot is completed
Troubleshooting the Power Subsystem
Problem Solving Using a Subsystems Approach
Identifying Startup Problems
Possible Cause
Symptom
Possible Solution
LED Label
configure Boot system filename
Troubleshooting the Firmware Package Installation
Diagnostic Action
Symptom
Diagnostic Action
Troubleshooting the Management Subsystem
Symptom
Possible Solution
Software Configuration Guide
See Initial System Configuration
Refer to IP Configuration in
See Initial System Configuration
Troubleshooting the Link Interface Subsystem
Check auto-negotiation
Configuring the GBE
Configuring the GBE
show interface
Page
The External Optical Bypass Module
A P P E N D I X A
External Optical Bypass Functionality
Figure A-1 External Optical Bypass Module Inactive not in bypass
Figure A-2 External Optical Bypass Module Active in bypass
The External Optical Bypass Module Front Panel
Installing the External Bypass Module
Installing the Module in a Rack
Cabling the External Optical Bypass Module
To cable the External Optical Bypass module
Step 6 Connect the control cable supplied in the kit from the Bypass 9-pin D-Type connector on the rear panel of the SCE 2000 platform to the Control connector on the External Optical Bypass module
Function
Specifications
Value
Pin D-type side
Page
Index
Page