Cisco Systems SCE 2000 4xGBE manual Cabling the Line Ports and Completing the Installation

Models: SCE 2000 4xGBE

1 152
Download 152 pages 7.79 Kb
Page 5
Image 5
Cabling the Line Ports and Completing the Installation 6-1

Contents

Step 1: Configuring Initial Settings 5-6

Step 2: Configuring the Hostname 5-7

Step 3: Setting the Passwords 5-7

Step 4: Configuring Time Settings 5-8

Step 5: Configuring the DNS Settings 5-10

Step 6: Configuring the RDR Formatter Destination 5-12

Step 7: Configuring Access Control Lists (ACLs) 5-13

Step 8: Configuring SNMP 5-17

Step 9: Configuring the Topology-Dependent Parameters 5-20

Step 10: Completing and Saving the Configuration 5-24

Connecting the Management Interface 5-26

Cabling the Management Port 5-27

Verifying Management Interface Connectivity 5-28

Cabling the Line Ports and Completing the Installation 6-1

Connecting the line ports to the network 6-1

Cabling Diagrams 6-2

Configuring the GBE Interface Parameters 6-7

Connecting the GBE Line Interface Ports 6-8

Testing Connectivity: Examining Link LEDs and Counters 6-10

Installing a Cascaded System 6-12

CLI Commands 6-13

Loading and Activating a Service Control Application 6-16

Basic SCE 2000 Platform Operations 7-1

Starting the SCE 2000 Platform 7-1

Checking Conditions Prior to System Startup 7-1

Starting the System and Observing Initial Conditions 7-2

Final Tests 7-3

Managing SCE 2000 Configurations 7-4

Viewing Configuration 7-4

Saving the Configuration Settings 7-7

Recovering a Previous Configuration 7-9

Performing Complex Configurations 7-10

Rebooting and Shutting Down the SCE Platform 7-11

SCE 2000 4xGBE Installation and Configuration Guide

 

OL-7824-02

iii

 

 

 

Page 5
Image 5
Cisco Systems SCE 2000 4xGBE Cabling the Line Ports and Completing the Installation, Basic SCE 2000 Platform Operations