Cisco Systems SCE 2000 4xGBE Basic SCE 2000 Platform Operations, Starting the SCE 2000 Platform

Models: SCE 2000 4xGBE

1 152
Download 152 pages 7.79 Kb
Page 111
Image 111
Basic SCE 2000 Platform Operations

C H A P T E R 7

Basic SCE 2000 Platform Operations

This chapter describes how to start up the SCE 2000 platform, reboot, and shutdown. It also describes how to manage configurations.

This chapter contains the following sections:

 

Starting the SCE 2000 Platform 7-1

 

Managing SCE 2000 Configurations

7-4

Performing Complex Configurations
7-10
Rebooting and Shutting Down the SCE Platform 7-11

Starting the SCE 2000 Platform

The procedures for starting the SCE 2000 platform are explained in the following sections:

Checking Conditions Prior to System Startup (on page 7-1)

Starting the System and Observing Initial Conditions (on page 7-2)

Checking Conditions Prior to System Startup

Check the following conditions before you start your SCE 2000 platform:

Both power supply units are installed and connected

First-time startup at installation:

SCE 2000 platform connected to local console (CON port)

The console terminal is turned on and properly configured

Subsequent startups

Line and Cascade interfaces are properly cabled (optional)

SCE 2000 platform is connected to at least one of the following types of management stations:

Direct connection to local console (CON port)

Remote management station via the LAN (Mng port)

SCE 2000 4xGBE Installation and Configuration Guide

 

OL-7824-02

7-1

 

 

 

Page 111
Image 111
Cisco Systems SCE 2000 4xGBE manual Basic SCE 2000 Platform Operations, Starting the SCE 2000 Platform, 7-10, C H A P T E R