Cisco Systems SCE 2000 4xGBE manual Cabling the External Optical Bypass Module

Models: SCE 2000 4xGBE

1 152
Download 152 pages 7.79 Kb
Page 144
Image 144
Cabling the External Optical Bypass Module

Appendix A The External Optical Bypass Module

Installing the External Bypass Module

Cabling the External Optical Bypass Module

The following procedure describes how to cable the External Optical Bypass module. Note the following:

All connections to the External Optical Bypass module are on the front panel of the module.

If installing only one module, the connections are as follows:

Connect the fiber (steps 3 and 4) to the GBE-1 Line ports on the SCE 2000 platform.

Connect the control cable to the Bypass 1 9-pin D-Type connector on the rear panel of the SCE 2000 platform.

If installing two modules, repeat the entire procedure for the second module, with the following changes:

Connect the fiber (steps 3 and 4) to the GBE-2 Line/Cascade ports on the SCE 2000 platform.

Connect the control cable to the Bypass 2 9-pin D-Type connector on the rear panel of the SCE 2000 platform.

Figure A-4: Bypass Connectors on the Rear of the SCE 2000

SCE 2000 4xGBE Installation and Configuration Guide

A-6

OL-7824-02

 

 

 

 

Page 144
Image 144
Cisco Systems SCE 2000 4xGBE manual Cabling the External Optical Bypass Module