Cisco Systems, Inc 170 West Tasman Drive San Jose, CA USA
SCE 2000 4xGBE Installation and Configuration Guide
Version OL-7824-02
Corporate Headquarters
Turn the television or radio antenna until the interference stops
SCE 2000 4xGBE Installation and Configuration Guide
Overview of the SCE 2000 Platform
C O N T E N T S
Preface
Introduction
Connecting the Management Interfaces and Performing Initial System
Installation and Maintenance
Configuration
Basic SCE 2000 Platform Operations
Cabling the Line Ports and Completing the Installation
The External Optical Bypass Module A-1
Troubleshooting
Index
Audience
Preface
Connecting the
Organization
Installation and
Maintenance on page
Obtaining Documentation on page
Related Publications
boldface screen font
Document Conventions
boldface font
italic font
Documentation Feedback
Obtaining Documentation
Obtaining Technical Assistance
Cisco.com
Definitions of Service Request Severity
Submitting a Service Request
Obtaining Additional Publications and Information
Preface Obtaining Additional Publications and Information
SCE 2000 4xGBE Installation and Configuration Guide
OL-7824-02
Page
C H A P T E R
Introduction
SCE Platform Management Interfaces
Chapter
SCE Platform Management Interfaces
SCE Platform Management Interfaces
SCE 2000 Installation Checklist
Service Control and the SCE Platform
Service Control and the SCE Platform
Checking the Shipping Container Contents
Link Type
Service Control Management
Model number
SCE 2020 4xGBE
Figure 2-2 SE2000 Front Panel
Front Panel
SCE 2000 4xGBE Installation and Configuration Guide
Chapter 2 Overview of the SCE 2000 Platform Front Panel
Connect This Port To…
Port
Quantity
Description
Description
LED Groups
Back Panel
SCE 2000 Component List
Checking the Shipping Container Contents
SCE 2000 Installation Checklist
Date
SCE 2000 Installation Checklist
Task
Verified
Page
The SCE 2000 Platform Topology Considerations
Topology
The SCE 2000 Platform
Topology Considerations
Number of links
Functionality
Redundancy
Bypass Mechanism
Link Continuity
Single SCE 2000 Topologies
Physical Topologies
Single Link Receive-only Topology
Figure 3-3 Single SCE Platform Dual Link Inline Topology
Dual link Inline Installation
Single Link Inline Topology
Figure 3-2 Single SCE Platform Single Link In-line Topology
Dual Link Receive-Only Topology
Two Cascaded SCE 2000s For Dual Links
Two Cascaded SCE 2000s Inline Topology
Topology-Related Parameters
Connection Mode Parameter
SCE 2000 Configuration
Inline/Receive-only
Priority
Physically Connected Links Parameter
On-Failure Mode Parameter
Page
Installing the SCE 2000 Platform
Installation and Maintenance
Preparing to Install the SCE 2000 Platform
Preparing to Install the SCE 2000 Platform
Tools and Parts Required
Airflow
Site Requirement Guidelines
Site Requirements
Installing the SCE 2000 Platform
Attaching a Chassis Ground Connection on page
Installation Precautions
Installation Precautions on page
Installing the SCE 2000 on a Workbench or Tabletop on page
Installing the SCE 2000 on a Workbench or Tabletop
Mounting Brackets for 2-post Rack Mounting Brackets for 4-post Rack
Rack-Mounting a SCE 2000 Platform
Attaching the Brackets to the SCE
Step 3 Repeat steps 1 and 2 on the other side of the SCE
Attaching the Crossrail Supports to the Rack
Figure 4-6 Assembling the Slider Brackets
Mounting the System to the Rack
Figure 4-8 Sliding the SCE 2000 into the Rack
Chapter 4 Installation and Maintenance
Installing the SCE 2000 Platform
SCE 2000 4xGBE Installation and Configuration Guide
Figure 4-9 Securing the SCE 2000 to the Rack
Attaching a Chassis Ground Connection
Figure 4-10 Grounding the Unit AC
Figure 4-11 Grounding the Unit DC
Chapter 4 Installation and Maintenance
Installing the SCE 2000 Platform
SCE 2000 4xGBE Installation and Configuration Guide
Power Supply Overview
LEDs
LED State
Power Supply Specifications
Power Supply Unit Condition
Power Supply Unit Condiiton
Replacing the Power Supply Unit on page
Removing and Replacing a Power Supply Unit
Powering Down the Power Supply Unit and Disconnecting Input Power
Removing the Power Supply Unit on page
Powering Down an AC-Input Power Supply
Replacing the Power Supply Unit
Removing the Power Supply Unit
Reconnecting DC-Input Power Supply Unit on page
Reconnecting the Power
Reconnecting AC-Input Power Supply Unit
Reconnecting AC-Input Power Supply Unit on page
Reconnecting DC-Input Power Supply Unit
Step 6 Turn the on/off switch to the on position
Removing and Replacing the Fan Module
Fan Module Overview
Removing the Fan Module on page Replacing the Fan Module on page
Replacing the Fan Module
Removing the Fan Module
Figure 4-17 Inserting the Fan Module
Replacing the Battery
Initial System Configuration
Performing Initial System Configuration
Connecting the Local Console
Connecting the Local Console
Setting Up the Local Console
Initial System Configuration
admin password
Following are some general instructions regarding the setup dialog
appear “Sorry, Skipping is not allowed at this stage.”
Step 1 Configuring Initial Settings
Enter IP address Enter IP subnet mask255.255.0.0
Step 2 Configuring the Hostname
Step 3 Setting the Passwords
Enter IP address of default gateway
Note Passwords are case sensitive
Step 4 Configuring Time Settings
Note The default password for all levels is “cisco”
To configure the time settings, complete the following steps
Enter
Step 5 Configuring the DNS Settings
Step 3 Type the default domain name to be used, and press Enter
Step 6 Configuring the RDR Formatter Destination
Entry Formats
Step 7 ConfiguringAccess Control Lists ACLs
Enter
Order of Entries
permit any deny
deny 10.1.1.0 permit any
Step 7 The maximum number of entries in an ACL is
We want to restrict Telnet access to only a few permitted stations
Enter SNMP GET community name
Step 8 Configuring SNMP
Would you like to enter the SNMP configuration menu? no y
Enable SNMP management? no y
Step 8 The maximum number of SET communities is
To disable the Authentication Failure trap, press Enter
Step 9 Configuring the Topology-Dependent Parameters
Secondary
To specify Primary, press Enter
EXAMPLE #3
EXAMPLE #2
Step 10 Completing and Saving the Configuration
Step 6 The system informs you that the configuration is complete
Cabling the Management Port on page
Connecting the Management Interface
Verifying Management Interface Connectivity on page
Cabling the Management Port
Verifying Management Interface Connectivity
C\ping 10.1.1.201 pinging PING 10.1.1.201 56 data bytes
Page
Installing a Cascaded System
Cabling the Line Ports and Completing the Installation
Connecting the line ports to the network
Connecting the line ports to the network
Dual Link Single SCE 2000 Topologies on page
Cabling Diagrams
Single Link Inline Topology on page
Single Link Receive-only Topology on page
Single Link Receive-only Topology
Dual Link Single SCE 2000 Topologies
Figure 6-4 Cabling Diagram Dual Link One SCE 2000 Receive-only
Figure 6-3 Cabling Diagram Dual Link One SCE 2000 Inline
SCE 2000 #1
Dual Link Two SCE 2000s Topology
SCE 2000 #2
Inline topologies require connecting both Receive and Transmit fibers to the SCE 2000. Cascade ports always require both Receive and Transmit fibers to be connected
Configuring GigabitEthernet Auto-Negotiation
Configuring the GBE Interface Parameters
Step 3 Type auto-negotiate and press Enter
Fiber Specifications
Connecting the GBE Line Interface Ports
Cabling the GBE Port
Figure 6-6 Cabling the GBE Interface
Step 2 Verify that the link LED is green
Reaching the Device
Testing Connectivity Examining Link LEDs and Counters
Examining the LEDs
Viewing the Counters to Verify that the Network Traffic is
The following example displays a system response
Installing a Cascaded System
Configuring the Connection Mode
CLI Commands
Topology-Related Parameters for Redundant Topologies
Link Mode
links forwardingbypasssniffingcutoff and press Enter
Monitoring the System
Service Control Application Suite for Broadband User Guide
Loading and Activating a Service Control Application
Service Control Application Suite for Broadband Reference Guide
Basic SCE 2000 Platform Operations
Managing SCE 2000 Configurations
Performing Complex Configurations
Rebooting and Shutting Down the SCE Platform
Starting the System and Observing Initial Conditions
Verifying Operational Status on page
Final Tests
Verifying Operational Status
Viewing the User Log Counters
Saving the Configuration Settings on page
Managing SCE 2000 Configurations
Viewing Configuration
Viewing Configuration on page
To view the running configuration, complete the following steps
Step 1 At the SCE 2000# prompt, type show version
Step 3 Type copy running-config startup-config
Saving the Configuration Settings
The following example shows the running configuration file
copy tffs0system/prevconf/config.tx1 tffs0system/config.txt
Recovering a Previous Configuration
Cisco Service Control Engine SCE Software Configuration Guide
Performing Complex Configurations
Cisco Service Control Engine SCE CLI Command Reference
Rebooting the SCE Platform
Rebooting and Shutting Down the SCE Platform
Step 2 Type reload shutdown
Shutting Down the SCE Platform
C H A P T E R
Troubleshooting
Troubleshooting Overview
Troubleshooting Overview Problem Solving Using a Subsystems Approach
Troubleshooting firmware package installation
Troubleshooting Tools
CLI Commands for Troubleshooting
CLI Commands for Troubleshooting on page The User Log on page
Troubleshooting the link interface subsystem
Troubleshooting the management subsystem
The Logging System
The User Log
Step 1 From the SCE 2000# prompt, type logger get user-log file-name
ftp//usernamepassword@ipaddress/path and press Enter
Copying the User Log
Viewing the User Log
Type Y and press Enter
Clearing the User Log
Viewing the User Log Counters
The system asks Are you sure?
SCE 2000 Operational Status on page
Check the LEDs
Generating a File for Technical Support
Front Panel on page
Boot is completed
SCE 2000 Operational Status
Booting
Initial state after reset
Identifying Startup Problems
Problem Solving Using a Subsystems Approach
Troubleshooting the Power Subsystem
LED Label
Symptom
Possible Solution
Possible Cause
Symptom
Troubleshooting the Firmware Package Installation
Diagnostic Action
configure Boot system filename
Possible Solution
Troubleshooting the Management Subsystem
Symptom
Diagnostic Action
See Initial System Configuration
See Initial System Configuration
Refer to IP Configuration in
Software Configuration Guide
Troubleshooting the Link Interface Subsystem
show interface
Configuring the GBE
Configuring the GBE
Check auto-negotiation
Page
A P P E N D I X A
The External Optical Bypass Module
Figure A-1 External Optical Bypass Module Inactive not in bypass
External Optical Bypass Functionality
Figure A-2 External Optical Bypass Module Active in bypass
The External Optical Bypass Module Front Panel
Installing the Module in a Rack
Installing the External Bypass Module
Cabling the External Optical Bypass Module
To cable the External Optical Bypass module
Step 6 Connect the control cable supplied in the kit from the Bypass 9-pin D-Type connector on the rear panel of the SCE 2000 platform to the Control connector on the External Optical Bypass module
Pin D-type side
Specifications
Value
Function
Page
Index
Page