Cisco Systems SCE 2000 4xGBE manual Attaching a Chassis Ground Connection

Models: SCE 2000 4xGBE

1 152
Download 152 pages 7.79 Kb
Page 49
Image 49
Figure 4-9: Securing the SCE 2000 to the Rack

Chapter 4 Installation and Maintenance

Installing the SCE 2000 Platform

Step 4 While keeping the brackets flush against the posts or mounting strips, align the holes in the brackets with the holes on the rack or mounting strip.

Figure 4-9: Securing the SCE 2000 to the Rack

Step 5 For each bracket, insert and tighten two appropriate screws to the rack.

Note Since the brackets support the weight of the entire SCE 2000 chassis, be sure to use all four screws to fasten the two rack-mount brackets to the rack posts.

Attaching a Chassis Ground Connection

Before you connect the power or turn on the power to the SCE 2000 platform, it is required that you provide an adequate chassis Ground (protective earth) connection for the SCE 2000 chassis. A Grounding kit is provided with each SCE 2000.

Use the Grounding kit to properly ground the SCE 2000 chassis (see SCE 2000 Component List (on page 2-7) for details).

Warning When installing the unit, the chassis ground connection must always be made first and disconnected last.

SCE 2000 4xGBE Installation and Configuration Guide

 

OL-7824-02

4-13

 

 

 

Page 49
Image 49
Cisco Systems SCE 2000 4xGBE manual Attaching a Chassis Ground Connection, 9 Securing the SCE 2000 to the Rack