C600 4508

Verifying system password (if DASD check OK)

C600 450A

Starting ’after DST’ DASD checker

C600 450C

DST IPL status

End of DST SRCs for Unattended IPLs.

C600 4A57

Parallel database recovery is at Pass 1

C600 4A60

Parallel database initialization is at Pass 1

C600 4B57

Parallel database recovery is at Pass 2

C600 4B60

Parallel database initialization is at Pass 2

C600 4C57

Parallel database recovery is at Pass 3

C600 4C60

Parallel database initialization is at Pass 3

C600 4F57

The system is recovering all database objects. This step can take several hours. It can occur any time when database recovery is in progress.

C600 4F60

The system is examining all objects during database initialization. It can occur any time when database initialization is in progress.

Note: At this point LIC initialization is complete, and operating system starts. All hardware is verified.

IPL SRC

Function Performed

If the system uses the OS/400 operating system, the following status SRCs appear:

C900 2810

Reclaim machine context

C900 2820

Resolve system objects

C900 2825

Convert Work Control Block Table

C900 2830

System value object

C900 28C0

Prepare SPCF job

C900 28C5

Initialize system objects

C900 2910

Start system logging

Chapter 6. System Reference Code (SRC) Information 211

Page 225
Image 225
IBM SY44-5902-05 C600 450C, C600 4A57, C600 4A60, C600 4B57, C600 4B60, C600 4C57, C600 4C60, C600 4F57, C600 4F60, C900