Log Analysis

Report

 

 

 

 

 

From

. . :

08/26/94 10:00:00

To

. :

08/27/94 10:00:00

Type option, press Enter.

 

 

 

 

 

5=Display report 6=Print report

 

 

 

 

System

 

 

Resource

Resource

Opt

Ref Code

Date

Time

Class

Name

Type

_

2661B000

08/26/94

12:53:20

Perm

CTL01

2661

_

2661B000

08/26/94

13:03:19

Perm

CTL01

2661

_

2661B000

08/26/94

13:15:44

Perm

CTL01

2661

_

2661B000

08/26/94

13:43:37

Perm

CTL01

2661

_

2661B000

08/26/94

13:49:22

Perm

CTL01

2661

_

6380FF04

08/26/94

14:13:43

Perm

DC01

6380

F3=Exit

 

 

 

 

 

F5=Refresh

F11=View description

 

 

 

 

F12=Cancel

Figure 49. Example Log Analysis Report

Resource name

The Name or Resource name field contains a description of the resource that is associated with the entry.

The system assigns a resource name, but that name might be changed to a new value by the customer. Depending on the data, the following priority scheme is used for the name field:

1.Device name

2.Controller name

3.Line name

4.Network interface name

5.A name that is created based on the data in the entry

The following names are created:

Subsystem

Possible Names

 

 

Processor

System

 

 

Storage

Storage

 

 

Workstation

LWS

 

 

Communications

COMM

 

 

Power

Power

 

 

Software

PGM

 

 

To select the Display report option, type 5 in the Opt (option) field for a specific resource and press the Enter key. A detailed report for that resource appears. If more than one entry has the same log ID, they are presented in the order of occurrence.

Chapter 3. Product Activity Log 111

Page 125
Image 125
IBM SY44-5902-05 manual Resource name, Subsystem Possible Names